My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-08-28_REVISION - M1987049
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1987049
>
2009-08-28_REVISION - M1987049
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:24:52 PM
Creation date
2/17/2016 12:19:03 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987049
IBM Index Class Name
REVISION
Doc Date
8/28/2009
Doc Name
Adequacy Review Response- Approved Substitute water supply plan AR02
From
Hart Environmental
To
DRMS
Type & Sequence
AR2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 1B <br />Ready Mixed - Bromley Lakes Pit <br />SWSP Projected Depletions (August 2009 - July 2010) <br />all values in acre-feet <br />[9] Total Lagged Depletions equals the depletions in column [8] (and depletions back to August 2006) lagged over 36 months. <br />[ 10] Number of Days there was a call on the South Platte River. <br />[11] Out -of -Priority Depletions is equal to the fraction of the Total Lagged Depletions that occurred when there was a call on the South Platte River, equal to [9] * ([10] / # of <br />days in month). <br />[12] Fulton Ditch Replacement credits based on 1.76 ac-ft/share as determined in the SACWSD change case engineering report for Case No 2001CW258. Return flow <br />obligations reduced by fraction of month under free river conditions. <br />[13] Surplus Fulton credits from the North Tower Pit SWSP. <br />[14] Total Replacement Requirement is the total of the out -of -priority depletions and the Fulton Ditch return flow obligation, equal to [11] - [12] if [12] is negative, otherwise <br />equal to [11]. <br />[15] Fulton credits delivered directly to the river. <br />[ 16] Stored Fulton Ditch credits (or water stored during free river) released to South Platte in order to replace depletions. Total storage given in column [9] of Table 2. <br />[17] Surplus Fulton credits available for diversion to storage or use at Ready Mixed Pit 1 based on Fulton Ditch credits, [12], and NTP Surplus Fulton Ditch Credits, [13], in <br />excess of the Out -of -Priority Depletions, [11]. <br />[ 18] Replacement water provided through a leased with the City of Brighton. <br />[19] Remaining replacement requirements equals [14] - [15] - [16] - [18]. <br />BBA <br />H \0430 - Boral\Bromley\NTP&BL SWSP renewal 6-9-09 xis BL <br />Total <br />Lagged <br />Depletions <br />Number <br />of Days <br />Out -of- <br />Priority <br />Out -of- <br />Priority <br />Depletions <br />Replacement <br />Credits from <br />Fulton Ditch <br />(25 shs) <br />NTP Surplus <br />Fulton HCU <br />Credits <br />Available <br />Total <br />Replacement <br />Requirement <br />Fulton <br />HCU <br />Direct To <br />River <br />Releases <br />From <br />Storage <br />To River <br />NTP & <br />Bromley Lakes <br />Surplus Fulton <br />HCU Credits <br />Brighton <br />Lease <br />Replacement <br />Remaining <br />Replacement <br />Requirement <br />Month <br />[9] <br />[10] <br />[11] <br />[12] <br />[13] <br />[14] <br />[15] <br />[16] <br />[17] <br />[18] <br />[19] <br />Aug <br />14.2 <br />31 <br />14.2 <br />11.4 <br />5.1 <br />14.2 <br />14.2 <br />0 <br />2.3 <br />0 0 0 N W 0 0 0 0 0 0 0 <br />0 <br />Sep <br />13.9 <br />30 <br />13.9 <br />5.3 <br />0.4 <br />13.9 <br />5.7 <br />8.2 <br />0 <br />0 <br />Oct <br />12.3 <br />31 <br />12.3 <br />0.8 <br />0 <br />12.3 <br />0.8 <br />11.6 <br />0 <br />0 <br />Nov <br />10.3 <br />30 <br />10.3 <br />-2.3 <br />0 <br />12.6 <br />0 <br />12.6 <br />0 <br />0 <br />Dec '09 <br />8.3 <br />31 <br />8.3 <br />-2.3 <br />0 <br />10.5 <br />0 <br />10.5 <br />0 <br />0 <br />Jan'10 <br />6.7 <br />31 <br />6.7 <br />-1.5 <br />0 <br />8.2 <br />0 <br />8.2 <br />0 <br />0 <br />Feb <br />5.3 <br />28 <br />5.3 <br />-1.5 <br />0 <br />6.9 <br />0 <br />6.9 <br />0 <br />0 <br />Mar <br />4.5 <br />31 <br />4.5 <br />-0.8 <br />0 <br />5.3 <br />0 <br />0 <br />0 <br />0 <br />Apr <br />5.0 <br />30 <br />5.0 <br />1.5 <br />0 <br />5.0 <br />1.5 <br />0 <br />0 <br />0 <br />May <br />7.6 <br />31 <br />7.6 <br />7.6 <br />0.7 <br />7.6 <br />7.6 <br />0 <br />0.7 <br />0 <br />Jun <br />10.6 <br />30 <br />10.6 <br />11.4 <br />3.7 <br />10.6 <br />10.6 <br />0 <br />4.5 <br />0 <br />Jul <br />13.1 <br />31 <br />13.1 <br />14.4 <br />7.4 <br />13.1 <br />13.1 <br />0 <br />8.7 <br />0 <br />09-10 Total <br />111.9 <br />365 <br />111.9 <br />44.0 <br />17.3 <br />120.2 <br />53.4 <br />58.0 <br />16.2 <br />8.8 <br />0 <br />[9] Total Lagged Depletions equals the depletions in column [8] (and depletions back to August 2006) lagged over 36 months. <br />[ 10] Number of Days there was a call on the South Platte River. <br />[11] Out -of -Priority Depletions is equal to the fraction of the Total Lagged Depletions that occurred when there was a call on the South Platte River, equal to [9] * ([10] / # of <br />days in month). <br />[12] Fulton Ditch Replacement credits based on 1.76 ac-ft/share as determined in the SACWSD change case engineering report for Case No 2001CW258. Return flow <br />obligations reduced by fraction of month under free river conditions. <br />[13] Surplus Fulton credits from the North Tower Pit SWSP. <br />[14] Total Replacement Requirement is the total of the out -of -priority depletions and the Fulton Ditch return flow obligation, equal to [11] - [12] if [12] is negative, otherwise <br />equal to [11]. <br />[15] Fulton credits delivered directly to the river. <br />[ 16] Stored Fulton Ditch credits (or water stored during free river) released to South Platte in order to replace depletions. Total storage given in column [9] of Table 2. <br />[17] Surplus Fulton credits available for diversion to storage or use at Ready Mixed Pit 1 based on Fulton Ditch credits, [12], and NTP Surplus Fulton Ditch Credits, [13], in <br />excess of the Out -of -Priority Depletions, [11]. <br />[ 18] Replacement water provided through a leased with the City of Brighton. <br />[19] Remaining replacement requirements equals [14] - [15] - [16] - [18]. <br />BBA <br />H \0430 - Boral\Bromley\NTP&BL SWSP renewal 6-9-09 xis BL <br />
The URL can be used to link to this page
Your browser does not support the video tag.