My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-08-19_REVISION - M1987049 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1987049
>
2009-08-19_REVISION - M1987049 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:24:52 PM
Creation date
2/17/2016 12:18:42 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987049
IBM Index Class Name
REVISION
Doc Date
8/19/2009
Doc Name
Adequacy Review Response AR02
From
Hart Environmental
To
DRMS
Type & Sequence
AR2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Dick Wolfe <br />r..�_. 1 '1nnn <br />Jul ' 1, GVUY <br />Page 3 <br />shown in Column [12]. Further background on RMCC's Fulton Ditch shares was given in the <br />December 18, 2006 SWSP request. <br />Other Stored Water <br />Additional replacement requirements will first be provided by water that RMCC has in storage <br />(110 ac -ft at the beginning of June 2009). Releases from storage for the Bromley Lakes Pit <br />replacements are shown in Table 1B, Column [16]. Total required storage releases for all three <br />pits are shown in Table 2, Column [6]. RMCC's portion of Kenneth Mitchell evaporation was <br />estimated based upon conservative storage projections provided by the City of Brighton. <br />Lease Water <br />Any remaining replacement requirement will be replaced by water leased from the City of <br />Brighton as shown in the Table 1B, Column [18]. The City of Brighton will either make releases <br />from Kenneth Mitchell Lake or will provide augmentation water from other sources approved by <br />the Water Commissioner. Brighton's agreement to lease water to RMCC is attached. <br />OPERATION OF PLAN <br />In order to prevent injury to other vested water rights, RMCC proposes to operate the SWSP for <br />the Bromley Lakes Pit under the following terms and conditions: <br />1. The total surface area of exposed groundwater at the Bromley Lakes Pit shall not exceed <br />44 acres. <br />2. RMCC will measure and deliver 25 shares of Fulton Ditch released directly to the river or <br />delivered to storage at Kenneth Mitchell Lake. All releases from storage will also be <br />measured before delivery into the South Platte River. <br />3. The Fulton shares committed to this SWSP shall not be sold or leased to any other entity. <br />The Fulton shares shall remain appurtenant to the Bromley Lakes site (Ready Mixed Pit <br />1, Bromley Lakes Pit, and North Tower Pit) until the plan for augmentation is obtained. <br />4. The contact person for purposes of this SWSP, who will be responsible for operation and <br />accounting of this plan, shall be Julia Keedy in our office. She can be reached at the <br />letterhead address and phone number, and her email address is ikeedyna,bbawater.com. <br />Tables 1A and 1B give the individualized monthly accounting for the pit's out -of -priority <br />depletions and replacement sources. The Fulton Ditch credits will be released to the river in the <br />summer months in order to replace all out -of -priority depletions. The excess Fulton Ditch credits <br />will be diverted to storage in order to be used for wintertime releases. After applying the credits <br />and return flow requirements associated with 25 Fulton Ditch shares, the remaining replacement <br />1'),1w�v�.bbawatcr.co:n <br />
The URL can be used to link to this page
Your browser does not support the video tag.