My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-10-15_REPORT - M1987049
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1987049
>
2009-10-15_REPORT - M1987049
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:56:12 PM
Creation date
2/17/2016 12:16:14 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987049
IBM Index Class Name
REPORT
Doc Date
10/15/2009
Doc Name
Cost Summary Form
From
DRMS
To
Bromley Lakes
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT IDENTIFICATION <br />Task # : 010 <br />Date : 10/14/2009 <br />User : JLE <br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />State : Colorado Permit/job# : M-1987-049 <br />County :Adams Abbreviation :none <br />Site : Bromley Lakes Filename : M049-010 <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action : AM02, Bond Estimate <br />Task description :Partially Backfill 20 acres of excavation in expansion area <br />HOURLY EQUIPMENT COST <br />Cost Breakdown : <br />Basic machine : Cat D9R - 9SU (2005) <br />Blade type : Semi -Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 : 3 -shank ripper <br />Utilization <br />Ownership cost/hour : $67.84 NA <br />Operating cost/hour : $126.03 100 <br />Ripper op. cost/hour : $1.73 20 <br />Operator cost/hour : $38.54 NA <br />Total unit cost/hour : $234.14 <br />MATERIAL QUANTITIES <br />Initial <br />volume : 193,600 LCY <br />Swell <br />factor : <br />NA <br />Horsepower: 405 <br />Shift basis : 1 per day <br />Data source : (CRG) <br />Total fleet cost/hour : $468.28 <br />Loose <br />volume : 193,600 LCY <br />Source of estimated volume :Estimate from Adequacy Review Response 10-5-09 and Exhibit D <br />Source of estimated swell factor :NA <br />HOURLY PRODUCTION <br />Average push distance : 200 feet <br />Unadjusted hourly production : 700 0 LCY/hr <br />Material consistency description : <br />Consolidated stockpile <br />Average push gradient : 30.00 % (neg) <br />Average site altitude : 4,980 feet <br />Material weight : <br />Weight description : <br />Earth - Loam <br />2,100 lbs/LCY <br />JOB TIME AND COST <br />Fleet size : <br />Unit cost : <br />2 Dozer(s) <br />$0 383 /LCY <br />Job Condition Correction Factors <br />Operator skill : <br />Material consistency : <br />Dozing method : <br />Visibility : <br />Job efficiency : <br />Spoil pile : <br />Push gradient : <br />Altitude : <br />Material weight : <br />Blade type : <br />Net correction : <br />0.75 <br />1 00 <br />1 00 <br />1.00 <br />0.83 <br />0.80 <br />1.60 <br />1.00 <br />1.10 <br />Source <br />(avg.) <br />(Cat HB) <br />(gen.) <br />(avg.) <br />(1 shift/day) <br />(fnd-rf) <br />(Cat HB) <br />(Cat HB) <br />1.00 <br />(Cat HB) <br />(S/SU/U) <br />0 87 <br />Adjusted unit production : 611.15 LCY/hr <br />Adjusted fleet production : 1,222.31 LCY/hr <br />Total job time : 158.39 Hours <br />Total job cost : $74,170 <br />
The URL can be used to link to this page
Your browser does not support the video tag.