My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-10-15_REPORT - M1987049
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1987049
>
2009-10-15_REPORT - M1987049
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:56:12 PM
Creation date
2/17/2016 12:16:14 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987049
IBM Index Class Name
REPORT
Doc Date
10/15/2009
Doc Name
Cost Summary Form
From
DRMS
To
Bromley Lakes
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT IDENTIFICATION <br />Task # : 009 <br />Date : 10/14/2009 <br />User : JLE <br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />State : Colorado <br />County :Adams <br />Site : Bromley Lakes <br />Permit/job# : M-1987-049 <br />Abbreviation : none <br />Filename : M049-009 <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action :AM02, Bond Estimate <br />Task description :Fully backfilling 20 acres in the expansion area <br />HOURLY EQUIPMENT COST <br />Cost Breakdown : <br />Basic machine <br />Blade type <br />Attachment no. 1 <br />Attachment no. 2 <br />:Cat D9R - 9SU (2005) <br />:Semi -Universal <br />:ROPS Cab <br />:3 -shank ripper <br />Ownership cost/hour : $67 84 <br />Utilization % <br />NA <br />Operating cost/hour : $126.03 <br />100 <br />Ripper op. cost/hour : $1.73 <br />MATERIAL QUANTITIES <br />Initial <br />volume : 387,200 LCY <br />20 <br />Operator cost/hour : $38.54 <br />NA <br />Total unit cost/hour : $234.14 <br />Swell <br />factor : <br />NA <br />Horsepower: 405 <br />Shift basis : 1 per day <br />Data source : (CRG) <br />Total fleet cost/hour : $468.28 <br />Loose <br />volume : 387,200 LCY <br />Source of estimated volume :Estimate based of Adequacy Review Response 10-5-09, and Exhibit D <br />Source of estimated swell factor :NA <br />HOURLY PRODUCTION <br />Average push distance : <br />Unadjusted hourly production : <br />200 feet <br />700.0 LCY/hr <br />Material consistency description : <br />Consolidated stockpile <br />Average push gradient : 30.00 % (neg) <br />Average site altitude : 4,980 feet <br />Material weight : <br />Weight description : <br />Earth - Loam <br />2.100 lbs/LCY <br />JOB TIME AND COST <br />Fleet size : <br />Unit cost : <br />2 Dozer(s) <br />$0.383 /LCY <br />Job Condition Correction Factors <br />Operator skill : <br />Material consistency : <br />Dozing method : <br />Visibility : <br />Source <br />0.75 (avg.) <br />1.00 (Cat HB) <br />1.00 (gen.) <br />1.00 (avg.) <br />Job efficiency : 0.83 (lshift/day) <br />Spoil pile : 0.80 (fnd-rf) <br />Push gradient : <br />Altitude : <br />Material weight : <br />Blade type : <br />Net correction : <br />1.60 (Cat HB) <br />1.00 (Cat HB) <br />1 10 (Cat HB) <br />100 (S/SU/U) <br />0.87 <br />Adjusted unit production : 611.15 LCY/hr <br />Adjusted fleet production : 1,222.31 LCY/hr <br />Total job time : 316.78 Hours <br />Total job cost : $148,341 <br />
The URL can be used to link to this page
Your browser does not support the video tag.