Laserfiche WebLink
CRIPPLE CREEK &VICTOR GOLD MINE 4 <br /> NEWMONT MINING CO. amec <br /> SQUAW GULCH VLF WEEKLY REPORT foster <br /> wheeler <br /> II) Storm Water Management <br /> Best Management Practices(BMPs) continued to be performed. <br /> CQA ACTIVITIES: <br /> I) Field Activities: <br /> The following activities were observed: Underground Working remediation; Structural Fill; Leak Detection; <br /> rip rap; and pump monitoring at the LVSCS riser pipes. <br /> II) Laboratory Activities: <br /> Concrete testing (ADR2),atterberg limits, moisture, compaction, permeability and sieve analysis testing <br /> continued. <br /> The following samples were collected: Cameron—Soil Liner Fill; SLF-208-C <br /> General Project Items <br /> Meetings and Discussions: <br /> The Weekly Contractor Meeting was held January 19, 2016 (Amec Foster Wheeler, CC&V, Ames). <br /> Ames daily safety meetings <br /> Amec Foster Wheeler daily safety meetings <br /> Summary of Concerns: None. <br /> CC&V: Daily updates, reporting, and scheduling occurred between CC&V Projects, Amec Foster <br /> Wheeler, and Ames. <br /> Deliveries: Ames received 96 rolls of Tensar UX1800-HS Uniaxial HDPE Geogrid. <br /> CQA Monitor Adne. <br /> Submitted by: Date: January 27, 2016 <br /> Bobby Redd, El <br /> Project Resident <br /> CC&V Projects // <br /> Reviewed By: % il) J�///7 4 Date: � G <br /> Reviewed By: Date: <br />