Laserfiche WebLink
CRIPPLE CREEK &VICTOR GOLD MINE <br /> NEWMONT MINING CO. amec A <br /> SQUAW GULCH VLF WEEKLY REPORT foster <br /> wheeler <br /> ATTACHMENT A <br /> Amec Foster Wheeler-2016 CQA Field Staff Schedule MLE2 <br /> Name Sun Mon Tues Wed Thurs Fri Sat <br /> Jan 17 Jan 18 Jan 19 Jan 20 Jan 21 Jan 22 Jan 23 <br /> Bobby Redd PR PR PR PR <br /> Eric Lorenson ST ST ST ST <br /> Rick Buxton LT LT LT LT LT <br /> Shawn Wisely UG UG UG UG <br /> Steve Rice UG UG UG UG <br /> Andrea Meduna <br /> LEGEND: <br /> UM = Unit Manager <br /> PM = Project Manager <br /> PCE = Project Certifying Engineer <br /> PE= Project Engineer <br /> PR= Project Resident <br /> LG = Lead Geosynthetics Engineer <br /> LS = Lead Soils Technician <br /> ST=Soil Technician <br /> LT= Laboratory Technician <br /> GL= Geosynthetics Lead <br /> GT= Geosynthetics Technician <br /> FLM= Field/Laboratory Manager <br /> UG = Underground Working Remediation <br /> SE = Senior Engineer <br /> GS =Geophysics Survey Geologist <br /> HY= Highway Design Engineer <br /> WI =Welding Inspector <br />