My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-02-05_REPORT - C1981041
DRMS
>
Day Forward
>
Report
>
Coal
>
C1981041
>
2016-02-05_REPORT - C1981041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2017 10:01:33 AM
Creation date
2/5/2016 10:34:38 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
Report
Doc Date
2/5/2016
From
J.E. Stover & Associates, Inc
To
DRMS
Annual Report Year
2015
Permit Index Doc Type
Annual Reclamation Report
Email Name
BFB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Snowcap Coal Company, Inc. <br />-13- 2015 Annual Reclamation Report <br />Area - 0.5 acres <br />Date - October 2011, October 2014 (re -seeded) <br />Seed Mix - "Seed Mix, Table 14-8", Upland Components - 2011 <br />"Salt Tolerant Seed Mix, Table 14-15" — 2014 <br />Pond 9 was backfilled, graded to final contours and seeded in 2013. <br />Phase I Bond Release was approved on 0.4 acres with SL -8 on November <br />14, 2015. Located in the SW'/4 Section 34, T10S, R98W, 6th P.M. <br />Area - 0.4 acres <br />Date - April 2013 <br />Seed Mix - "Seed Mix, Table 14-8", Upland Components <br />30. Roadside South Portal Road to Old Upper Diversion Ditch and Water <br />Tank (Light Use Road #1 ) - Portions of Light Use Road #1, as approved <br />by PR -3, was graded to approximate original contours and seeded. <br />Phase I Bond Release was approved on 1.9 acres with SL -4 on January <br />11, 2009. Located in SE'/ Section 34, T10S, R98W, 6th P.M. <br />Area - 1.9 acres <br />Date - September 2007 <br />Seed Mix - "Seed Mix, Table 14-8", Upland Components <br />31. Railroad Loop Track (South of 19/10 Road) - The Railroad Loop Track <br />that lies south of 19/10 Road was removed, regraded, backfilled and <br />seeded. This 0.3 acre area was part of the 2.1 acres that achieved final <br />Phase I, II & III Bond Release with SL -5, approved on November 5, 2009. <br />Located in the NWY4 Section 34, T10S, R98W, 6th P.M. <br />Area - 0.3 acres <br />Date - January 2009 <br />Seed Mix - "Seed Mix, Table 14-8", Lowland Components <br />Phase III Bond Release - 0.3 acres <br />32. Cameo Refuse Disposal Area No. 1 (Road) - The "access" road (1.2 <br />acres) to Cameo Refuse Disposal Area No. 1 that had been left open for <br />coal fines clean up was regraded and backfilled to approved final contours <br />and seeded. Phase I Bond Release was approved on 1.2 acres with SL -8 <br />on November 14, 2015. Located in the SE% Section 28, T10S, R98W, 6th <br />P.M. <br />Area - 1.2 Acres <br />Date - September 2010 <br />Seed Mix - "Seed Mix, Table 14-8", Upland Components <br />33. Unit Train Load -out and Railroad Loop Track/Conveyor Corridor - <br />Portions of the Unit Train Load -out and Railroad Loop Track/Conveyor <br />Corridor where reclaimed as per approved Permit Revision #4 (PR -4). <br />38.1 acres were backfilled and graded during 2010. 0.9 acres, which <br />includes reclaimed Ponds 1 and 2, footprint of Topsoil Pile #4, and small <br />area where coal fines where removed, was seeded. Phase I, II & III Bond <br />Release was approved on 66.7 acres with SL -7 on April 26, 2011. <br />Located in Sections 26, 27 & 34 T10S, R98W, 6th P.M. <br />
The URL can be used to link to this page
Your browser does not support the video tag.