My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-02-05_REPORT - C1981041
DRMS
>
Day Forward
>
Report
>
Coal
>
C1981041
>
2016-02-05_REPORT - C1981041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2017 10:01:33 AM
Creation date
2/5/2016 10:34:38 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
Report
Doc Date
2/5/2016
From
J.E. Stover & Associates, Inc
To
DRMS
Annual Report Year
2015
Permit Index Doc Type
Annual Reclamation Report
Email Name
BFB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Snowcap Coal Company, Inc. -12- 2015 Annual Reclamation Report <br />Date - July 2003 <br />Seed Mix - "Seed Mix, Table 14-8", Lowland Components <br />Phase III Bond Release - 2.7 acres <br />27. Conveyor Corridor - The conveyor corridor, from the Xcel culvert south <br />to Transfer Building #2 and east of Colorado River where conveyor tube <br />crossed river was graded to approximate original contours and seeded. <br />Phase I Bond Release was approved on 0.6 acres with SL -4 on January <br />11, 2009 and on 1.0 acres with SL -5 on November 5, 2009. A total of 1.3 <br />acres in this area achieved final Phase II & III Bond Release with SL -5 on <br />November 5, 2009. Located in SE%, Section 27 and NW%, Section 34, <br />T10S, R98W, 6th P.M. <br />Area - 1.6 acres <br />Date - March 2004 <br />Seed Mix - "Seed Mix, Table 14-8", Lowland Components <br />Phase III Bond Release - 1.3 acres <br />28. Substation A - Superstructures, fences, slabs and components removed <br />during 2007. Graded to approximate original contours and seeded. <br />Phase I Bond Release was approved on 0.2 acres with SL -4 on January <br />11, 2009. Located in the SEY4 Section 34, T10S, R98W, 6th P.M. <br />Area - 0.2 acres <br />Date - August 2007 <br />Seed Mix - "Seed Mix, Table 14-8", Upland Components <br />29. Roadside South Portal Mine Facilities and Stockpile/Prep Plant Area <br />and Conveyor Tunnel Under 1-70 - The Roadside South Portal Mine <br />Facilities, Stockpile and Prep Plant areas where reclaimed as per <br />approved Permit Revision #3 (PR -3). 13.5 acres were reclaimed during <br />the last two quarters of 2007. These acres include all back filled and <br />graded areas along with buildings and asphalt areas that were approved <br />for retention through PR -3. The east end of the Conveyor Tunnel was <br />backfilled and filled with a 2 foot concrete plug. Due to inclement weather <br />and frozen soils, seeding was postponed until the 1St quarter of 2008. <br />Phase I Bond Release was approved on 13.5 acres with SL -4 on January <br />11, 2009. These 13.5 acres achieved final Phase II & III Bond Release <br />with SL -6 on December 14, 2010. Located in the SW% & SE% Section <br />34, T10S, R98W, 6th P.M. <br />Area - 13.5 acres reclaimed <br />(9.6 acres backfilled and graded) <br />(6.4 acres top soiled) <br />Date - December 2007 <br />Seed Mix - "Seed Mix, Table 14-8", Upland Components <br />Phase III Bond Release - 13.5 acres <br />Pond 8 and surrounding area was backfilled, graded to final contours and <br />seeded in 2011. Phase I Bond Release was approved on 0.5 acres with <br />SL -8 on November 14, 2015. Located in the SW% & SE% Section 34, <br />T10S, R98W, 6th P.M. <br />
The URL can be used to link to this page
Your browser does not support the video tag.