Laserfiche WebLink
Snowcap Coal Company, Inc. <br />-11- 2015 Annual Reclamation Report <br />Permanent Disturbance — North Portal - Portions of the Upper Diversion <br />Ditch, 1.4 acres, and the remnants of Top Soil Pile #2, 0.3 acres, were <br />approved as permanent features on August 12, 2012 with PR -5. Phase I, <br />II & III Bond Release was approved on 1.7 acres with SL -8 on November <br />14, 2015. <br />Area —1.7 Acres <br />Phase III Bond Release — 1.7 acres <br />23. Substation B - Superstructures, fences, slabs and components removed <br />during 2002. Graded to approximate original contours and seeded. <br />Phase I Bond Release was approved on 0.3 acres with SL -2 on October <br />27, 2003. Phase II Bond Release was approved on 0.3 acres with SL -8 <br />on November 14, 2015. Located in the SW% Section 35, T10S, R98W, <br />6th P.M. <br />Area - 0.3 acres <br />Date - November 2002 <br />Seed Mix - "Seed Mix, Table 14-8", Upland Components <br />24. 2 West Portals - Substation of portal area -Reference Exhibit 58. Phase I <br />Bond Release was approved on 0.7 acres with SL -2 on October 27, 2003. <br />Phase II & III Bond Release was approved on 0.7 acres with SL -8 on <br />November 14, 2015. Located in the NE%, Section 11, T11 S, R98W, 6th <br />P.M. <br />Area - 0.7 acres <br />Date - December 2001 <br />Seed Mix - "Seed Mix, Table 14-6" <br />Phase III Bond Release — 0.7 acres <br />25. Cameo Refuse Disposal Area Topsoil Piles - These piles were used for <br />top soiling the CRDA2 during final reclamation activities. Phase I Bond <br />Release was approved on 2.9 acres with SL -2 on October 27, 2003. <br />Phase II & III Bond Release was approved on 2.9 acres with SL -8 on <br />November 14, 2015. Located in the SEY4, Section 28, T10S, R98W, 6th <br />P.M. <br />Area - 2.9 acres <br />Date - April 2002 <br />Seed Mix - "Seed Mix, Table 14-13", Upland Components <br />Phase III Bond Release — 2.9 acres <br />26. Conveyor Corridor - The conveyor corridor, from the Xcel culvert north to <br />Haul Road #3 was graded to approximate original contours and re- <br />seeded. Phase I Bond Release was approved on 2.2 acres with SL -2 on <br />October 27, 2003 and on 0.5 acres with SL -5 on November 5, 2009. The <br />0.5 acres achieved final Phase II & III Bond Release with SL -5, approved <br />on November 5, 2009 and the 2.2 acres achieved final Phase II & III Bond <br />Release with SL -7, approved on April 26, 2011. Located in SE'/, Section <br />27 and NW%, Section 34, T10S, R98W, 6th P.M. <br />Area - 2.7 acres <br />