Laserfiche WebLink
Snowcap Coal Company, Inc. <br />-14- 2015 Annual Reclamation Report <br />Area - 38.1 acres reclaimed 0.9 acres seeded <br />Date - June & September 2010 <br />Seed Mix - "Seed Mix, Table 14-8", Lowland Components <br />Phase III Bond Release - 66.7 acres <br />Permanent Disturbance — Haul Road #3 - Haul Road #3, 0.9 acres, was <br />approved as a permanent feature. Phase I, II & III Bond Release was <br />approved on 0.9 acres with SL -7 on April 26, 2011. <br />Area — 0.9 Acres <br />Phase III Bond Release — 0.9 acres <br />34. Cameo Refuse Disposal Area No. 1 & 2 Sediment Ponds (6 & 10) — <br />Sediment Ponds 6 and 10 where filled, graded, top soiled and seeded. <br />Phase I Bond Release was approved on 2.4 acres with SL -8 on November <br />14, 2015. Located in the SE%, Section 28, T1 OS, R98W, 6th P.M. <br />Area — 2.4 acres <br />Date — October 2012 <br />Seed Mix - "Seed Mix, Table 14-8", Upland Components <br />Permanent Disturbance — Coal Creek Realignment - The disturbed <br />acres associated with the previously approved realignment of Coal Creek, <br />0.8 acres, were approved as permanent features on August 12, 2012 with <br />PR -5. Phase I, II & III Bond Release was approved on 0.8 acres with SL -8 <br />on November 14, 2015. <br />Area — 0.8 Acres <br />Phase III Bond Release — 0.8 acres <br />35. Permanent Disturbance - Haul Roads to CRDA 1, 2 & 3 - By agreement <br />with the Bureau of Land Management and Xcel Energy, these roads were <br />left in place and are considered permanent disturbances. Phase I, II & III <br />Bond Release was approved on 3.4 acres with SL -8 on November 14, <br />2015. <br />Area - 3.4 acres <br />Phase III Bond Release - 3.4 acres <br />2. Vegetation Studies — No Vegetation Studies were conducted in 2015. <br />