Laserfiche WebLink
Geotechnical Exhibit for the WRL design. Figure 9 below shows existing waste block structures <br />used as intermediate dump faces. <br />Figure 9- Construction of Block Wall <br />Ramps to access the workings within the quarry have not been shown on the maps. Ramp locations <br />are temporary. Marble excavated from the mine is in complete blocks, which are then broken with <br />a hydraulic breaker for placement via dump trucks and front end loaders. Ramps will be constructed <br />from this broken marble material. In -quarry ramps are built at 20% slopes compared the access <br />roads which have been developed at 15% grades. <br />6. Schedule of Operations <br />The working hours of the quarry to Monday thru Friday from 6AM to 10PM and on Saturdays from <br />6AM to 2PM. Trucking of finished marble blocks from the trans -load facility have been scheduled <br />to occur outside normal commute times of the residents of Marble, CO. <br />The Pride of America DRMS 112c <br />Exhibit D - 10 12/23/15 <br />