Laserfiche WebLink
a`f. <br /> CRIPPLE CREEK & VICTOR GOLD MINING Co. <br /> ANGLOGOLD ASHANTI (COLORADO) amec <br /> SQUAW GULCH (VLF) WEEKLY REPORT foster <br /> Wheeler <br /> Soil Liner Fill: <br /> Cameron SLF processing continued. <br /> Drain Cover Fill: <br /> None. <br /> Rip Rap: <br /> Rip rap was placed in the Phase 2 diversion channel between stations S42+00 to S46+00. <br /> Underground Workings: <br /> Confirmatory Drilling: <br /> None. <br /> Remediation: <br /> UG#6673: Cat dozers, a Cat skidsteer and a Cat smooth drum roller graded and <br /> compacted subgrade for geogrid per project plans and specifications. Completed <br /> placement of first geogrid layer on approved subgrade. Began placement of first 6-inch <br /> lift of Select Structural Fill. Further remediation required. <br /> UG#6468: Verified that concrete plug met strength requirements and placed cemented <br /> rock fill to complete remediation. Site was backfilled and compacted per project plans <br /> and specifications. <br /> UG#6678: Verified that concrete plug met strength requirements and placed cemented <br /> rock fill to complete remediation. Site was backfilled and compacted per project plans <br /> and specifications. <br /> UG#6542: Verified that concrete plug met strength requirements and placed cemented <br /> rock fill to complete remediation. Site was backfilled and compacted per project plans <br /> and specifications. <br /> Underdrain System: <br /> Primary Underdrain: Complete. <br /> Secondary Underdrain: None. <br /> Tertiary Underdrain: None. <br /> Leak Detection: <br /> None. <br /> Geomembrane: <br /> None. <br /> Miscellaneous: <br /> None. <br /> II) Storm Water Management <br /> Best Management Practices (BMPs) continued to be performed. <br />