My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-01-20_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2016-01-20_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/17/2020 9:01:19 PM
Creation date
1/22/2016 9:09:02 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
1/20/2016
Doc Name
Weekly QA Report
From
Newmont
To
DRMS
Annual Report Year
2016
Report Quarter_Month
Jan
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CRIPPLE CREEK & VICTOR GOLD MINING Co. A. <br /> ANGLOGOLD ASHANTI (COLORADO) amec <br /> SQUAW GULCH (VLF) WEEKLY REPORT foster <br /> wheeler <br /> CQA ACTIVITIES: <br /> 1) Field Activities: <br /> The following activities were observed: Underground Working remediation; Structural Fill; Phase 2 <br /> Diversion Channel, Rip Rap and pump monitoring at the LVSCS riser pipes. <br /> 11) Laboratory Activities: <br /> Concrete testing (ADR2), atterberg limits, moisture, compaction, permeability and sieve analysis testing <br /> continued. Sampled and shipped 5 resin lots of geogrid for conformance testing. <br /> The following samples were collected: Cameron—Soil Liner Fill; SLF-206-C <br /> General Proiect Items <br /> Meetings and Discussions: <br /> The Weekly Contractor Meeting was held January 05, 2016 (Amec Foster Wheeler, CC&V, Ames). <br /> Ames daily safety meetings <br /> Amec Foster Wheeler daily safety meetings <br /> Contractor risk assessment and SOP development meetings <br /> Summary of Concerns: None. <br /> CC&V: Daily updates, reporting, and scheduling occurred between CC&V Projects, Amec Foster <br /> Wheeler, and Ames. <br /> Deliveries: None. <br /> CQA Monitor �12 <br /> Submitted by: Date: January 11, 2016 <br /> Bobby Redd, El <br /> Project Resident <br /> Reviewed by: Date: <br /> CC&V Projects <br /> Reviewed By: % � _ Date: r /13 t(- <br /> Reviewed By: Date: <br />
The URL can be used to link to this page
Your browser does not support the video tag.