Laserfiche WebLink
SPECIFICATION NUMBER: <br /> Climax Molybdenum CONCRETE CONSTRUCTION 03 30 00 SPE <br /> AFreepor€-McMoRanCompany TECHNICAL SPECIFICATION PROJECT NAME: <br /> CAVR Shaft Closure Project <br /> 1. Although cold joints are not anticipated or required for this project, if <br /> complete concrete placement is discontinued for any reason, the following <br /> procedures for cold joints shall be followed: <br /> a. The surface of the first concrete placement shall be left in a roughened <br /> stated and not floated or finished to leave a good surface of well bonded <br /> aggregate. <br /> b. Hardened concrete surfaces on which new concrete is to be placed shall <br /> be kept wet for 24 hours prior to the pour. Pools of free-standing water <br /> shall be removed and a neat cement mortar having about the same <br /> proportion of cement to sand as the new concrete shall be well brushed <br /> into the surface just prior to placing the new concrete. This mortar shall <br /> not be allowed to dry out or harden before the new concrete is placed. <br /> B. Cleaning <br /> 1. All debris, foreign material, ice and snow shall be cleaned from the interior <br /> of forms,trenches or excavations. Concrete shall not be placed on or against <br /> frozen soil or subgrade unless a written procedure is submitted to the <br /> Engineer for approval. <br /> 2. Forms, reinforcement and embedded items shall be free of all dirt, oil and <br /> foreign material including hardened or dried concrete or curing compound <br /> splashed on them from previous concrete placements. <br /> C. Inspection Prior to Placement <br /> 1. The terms "shall be", "shall have been", "shall be checked" or "shall be <br /> verified"will mean the work has been performed with the knowledge of and <br /> to the satisfaction of, or under direct supervision of,the Engineer or Owner. <br /> 2. Formwork, placement of reinforcement and embedded items shall have <br /> been checked for dimensions, elevations, location and tolerances prior to <br /> placing concrete. <br /> 3. Formwork shall have been checked for design, shoring and adequacy in <br /> accordance with Section 3.02E.D of this Specification. <br /> 4. Reinforcement shall have been checked for proper size, positioning, <br /> welding, tying and support in accordance with Section 3.02H of this <br /> Specification, and the Design Drawings. <br /> 5. All equipment required for the placing of concrete in the work shall have <br /> been properly cleaned and the operation of mechanical equipment checked <br /> for reliability to perform its intended use. <br /> 114-910345 CONCRETE CONSTRUCTION <br /> Climax CAVR Shaft Closure Project 03 30 00 SPE-14 <br />