Laserfiche WebLink
Cripple Creek & Victor Gold Mining Company <br />Squaw Gulch Valley Leach Facility-Phase 1 <br />(9,550' Bench to Completed Areas Outlined on Figure 2) <br />Geomembrane Fusion Trial Seam Summary <br />DATE SAMPLE <br />NUMBER TIME MACHINE <br />NUMBER <br />WELD <br />TECH. <br />AMBIENT <br />AIR <br />TEMPERATURE <br />(oF) <br />MACHINE SETTINGS <br />QA <br />MONITOR REMARKSMACHINE <br />TEMPERATURE <br />(oF) <br />SPEED <br />SETTING <br />(fps) <br />INSIDE PEEL <br />(Min.=100) <br />OUTSIDE PEEL <br />(Min.=100) <br />SHEAR <br />(Min.=130) <br />STENGTH <br />(ppi)MODE1 <br />10/08/14 TF-1 2:12 PM 93 JR 63 850 11.0 165 BRK PASS DW Textured on Textured <br />STENGTH <br />(ppi)MODE1 STENGTH <br />(ppi)MODE <br />TEST RESULTS <br />PASS <br />OR <br />FAIL <br />136 SE1 137 SE1 <br />137 SE1 145 SE1 <br />140 SE1 134 SE1 <br />143 SE1 145 SE1 <br />127 SE1 130 SE1 <br />137 SE1 139 SE1 <br />125 SE1 139 SE1 <br />144 SE1 123 SE1 <br />149 SE1 143 SE1 <br />151 SE1 137 SE1 <br />137 SE1 136 SE1 <br />155 SE1 141 SE1 <br />157 SE1 143 SE1 <br />154 SE1 145 SE1 <br />133 SE1 130 SE1 <br />148 SE1 126 SE1 <br />113 SE1 139 SE1 <br />137 SE1 145 SE1 <br />160 SE1 131 SE1 <br />149 SE1 148 SE1 <br />152 SE1 156 SE1 <br />133 SE1 141 SE1 <br />123 SE1 117 SE1 <br />116 SE1 141 SE1 <br />117 SE1 130 SE1 <br />115 SE1 126 SE1 <br />130 SE1 148 SE1 <br />152 SE1 149 SE1 <br />156 SE1 159 SE1 <br />137 SE1 164 SE1 <br />154 SE1 141 SE1 <br />131 SE1 140 SE1 <br />148 SE1 146 SE1 <br />161 SE1 161 SE1 <br />117 SE1 121 SE1 <br />120 SE1 132 SE1 <br />07/18/15 TF-217 8:00 AM 92 JR 50 800 12.0 153 BRK PASS BM Smooth on Smooth <br />07/18/15 TF-218 8:05 AM 92 JR 60 800 12.0 150 BRK PASS BM Textured on Textured <br />07/18/15 TF-219 8:03 AM 96 RR 60 800 12.0 133 BRK PASS BM Smooth on Textured <br />07/18/15 TF-220 1:12 PM 94 RR 75 800 12.0 143 BRK PASS AF Smooth on Smooth <br />07/18/15 TF-221 1:17 PM 92 JR 75 800 12.0 160 BRK PASS AF Smooth on Smooth <br />07/18/15 TF-222 1:09 PM 94 RR 74 800 12.0 150 BRK PASS AF Textured on Textured <br />07/19/15 TF-223 8:12 AM 92 JR 60 800 12.0 166 BRK PASS TJB Smooth on Smooth <br />07/19/15 TF-224 8:12 AM 92 JR 60 800 12.0 142 BRK PASS TJB Textured on Textured <br />07/19/15 TF-225 8:11 AM 94 RR 60 800 12.0 168 BRK PASS TJB Smooth on Smooth <br />Smooth on Textured <br />07/19/15 TF-226 8:06 AM 94 RR 60 800 12.0 156 BRK PASS TJB Textured on Textured <br />92 JR 54 800 12.0 168 BRK PASS BM Smooth on Smooth07/21/15 TF-227 12:30 PM <br />800 12.0 152 BRK PASS KS Textured on Textured <br />07/21/15 TF-228 12:35 PM 94 RR 54 800 12.0 164 BRK PASS BM Smooth on Smooth <br />07/21/15 TF-229 12:50 PM 92 JR 54 800 12.0 134 BRK PASS BM <br />07/22/15 TF-230 10:56AM 94 RR 61 800 12.0 162 BRK PASS KS Smooth on Smooth <br />07/22/15 TF-232 11:00 AM 92 JR 61 800 12.0 157 BRK PASS KS Smooth on Smooth <br />07/22/15 TF-231 10:58 AM 94 RR 61 <br />07/22/15 TF-233 11:05 AM 92 JR 61 800 12.0 138 BRK PASS KS Textured on Textured <br />07/22/15 TF-234 3:30 PM 94 RR 70 800 12.0 143 BRK PASS MT Smooth on Smooth <br />1 See Figures 3 for Modes <br />Page 13 of 39