Laserfiche WebLink
Cripple Creek & Victor Gold Mining Company <br />Squaw Gulch Valley Leach Facility-Phase 1 <br />(9,550' Bench to Completed Areas Outlined on Figure 2) <br />Geomembrane Fusion Trial Seam Summary <br />DATE SAMPLE <br />NUMBER TIME MACHINE <br />NUMBER <br />WELD <br />TECH. <br />AMBIENT <br />AIR <br />TEMPERATURE <br />(oF) <br />MACHINE SETTINGS <br />QA <br />MONITOR REMARKSMACHINE <br />TEMPERATURE <br />(oF) <br />SPEED <br />SETTING <br />(fps) <br />INSIDE PEEL <br />(Min.=100) <br />OUTSIDE PEEL <br />(Min.=100) <br />SHEAR <br />(Min.=130) <br />STENGTH <br />(ppi)MODE1 <br />10/08/14 TF-1 2:12 PM 93 JR 63 850 11.0 165 BRK PASS DW Textured on Textured <br />STENGTH <br />(ppi)MODE1 STENGTH <br />(ppi)MODE <br />TEST RESULTS <br />PASS <br />OR <br />FAIL <br />129 SE1 130 SE1 <br />125 SE1 131 SE1 <br />141 SE1 130 SE1 <br />146 SE1 130 SE1 <br />149 SE1 140 SE1 <br />156 SE1 138 SE1 <br />148 SE1 135 SE1 <br />147 SE1 151 SE1 <br />120 SE1 138 SE1 <br />138 SE1 139 SE1 <br />130 SE3 144 SE1 <br />134 SE3 134 SE1 <br />123 SE1 143 SE1 <br />122 SE1 132 SE1 <br />138 SE1 130 SE1 <br />140 SE1 147 SE1 <br />155 SE1 154 SE1 <br />154 SE1 147 SE1 <br />148 SE1 127 SE1 <br />153 SE1 130 SE1 <br />161 SE1 142 SE1 <br />148 SE1 160 SE1 <br />143 SE1 155 SE1 <br />149 SE1 140 SE1 <br />161 SE1 157 SE1 <br />157 SE1 152 SE1 <br />125 SE1 148 SE1 <br />111 SE1 139 SE1 <br />130 SE1 151 SE1 <br />136 SE1 145 SE1 <br />150 SE1 151 SE1 <br />160 SE1 154 SE1 <br />111 SE1 130 SE1 <br />119 SE1 130 SE1 <br />116 SE1 135 SE1 <br />130 SE1 132 SE1 <br />07/22/15 TF-235 3:35PM 92 JR 70 800 12.0 132 BRK PASS MT Smooth on Smooth <br />07/23/15 TF-236 8:00 AM 92 JR 56 800 12.0 173 BRK PASS MT Smooth on Smooth <br />07/23/15 TF-237 8:05 AM 92 JR 56 800 12.0 160 BRK PASS MT Textured on Textured <br />07/23/15 TF-238 8:06 AM 94 RR 56 800 12.0 141 BRK PASS MT Textured on Textured <br />07/23/15 TF-239 8:09 AM 94 RR 56 800 12.0 162 BRK PASS MT Smooth on Smooth <br />07/23/15 TF-240 8:15 AM 94 RR 60 800 12.0 156 BRK PASS MT Smooth on Textured <br />07/24/15 TF-241 10:00 AM 92 JR 64 800 12.0 147 BRK PASS AF Smooth on Textured <br />07/24/15 TF-242 9:55 AM 94 RR 64 800 12.0 156 BRK PASS AF Smooth on Smooth <br />07/24/15 TF-243 9:58 AM 92 JR 64 800 12.0 169 BRK PASS AF Smooth on Smooth <br />07/24/15 TF-244 10:05 AM 92 JR 64 800 12.0 135 BRK PASS AF Textured on Textured <br />07/24/15 TF-245 10:00 AM 94 RR 64 800 12.0 170 BRK PASS AF Textured on Textured <br />07/27/15 TF-246 8:00 AM 92 JR 62 800 12.0 172 BRK PASS AF Smooth on Smooth <br />07/27/15 TF-247 8:05 AM 92 JR 62 800 12.0 162 BRK PASS AF Textured on Textured <br />07/27/15 TF-248 8:13 AM 94 RR 62 800 12.0 164 BRK PASS AF Smooth on Smooth <br />07/27/15 TF-249 8:10 AM 94 RR 62 800 12.0 163 BRK PASS AF Textured on Textured <br />07/27/15 TF-250 8:20 AM 94 RR 70 800 12.0 156 BRK PASS AF Smooth on Textured <br />07/27/15 TF-251 1:03 PM 92 JR 70 800 12.0 132 BRK PASS AF Smooth on Smooth <br />07/27/15 TF-252 1:06 PM 92 JR 70 800 12.0 126 BRK PASS AF Textured on Textured <br />1 See Figures 3 for Modes <br />Page 14 of 39