Laserfiche WebLink
Cripple Creek & Victor Gold Mining Company <br />Squaw Gulch Valley Leach Facility-Phase 1 <br />(9,550' Bench to Completed Areas Outlined on Figure 2) <br />Geomembrane Fusion Trial Seam Summary <br />DATE SAMPLE <br />NUMBER TIME MACHINE <br />NUMBER <br />WELD <br />TECH. <br />AMBIENT <br />AIR <br />TEMPERATURE <br />(oF) <br />MACHINE SETTINGS <br />QA <br />MONITOR REMARKSMACHINE <br />TEMPERATURE <br />(oF) <br />SPEED <br />SETTING <br />(fps) <br />INSIDE PEEL <br />(Min.=100) <br />OUTSIDE PEEL <br />(Min.=100) <br />SHEAR <br />(Min.=130) <br />STENGTH <br />(ppi)MODE1 <br />10/08/14 TF-1 2:12 PM 93 JR 63 850 11.0 165 BRK PASS DW Textured on Textured <br />STENGTH <br />(ppi)MODE1 STENGTH <br />(ppi)MODE <br />TEST RESULTS <br />PASS <br />OR <br />FAIL <br />111 SE1 116 SE1 <br />138 SE1 122 SE1 <br />106 SE1 125 SE1 <br />116 SE1 112 SE1 <br />116 SE1 137 SE1 <br />141 SE1 115 SE1 <br />121 SE1 145 SE1 <br />139 SE1 124 SE1 <br />143 SE1 136 SE1 <br />145 SE1 131 SE1 <br />154 SE1 149 SE1 <br />147 SE1 148 SE1 <br />126 SE1 129 SE1 <br />139 SE1 138 SE1 <br />125 SE1 127 SE1 <br />126 SE1 141 SE1 <br />131 SE1 142 SE1 <br />130 SE1 124 SE1 <br />106 SE1 120 SE1 <br />109 SE1 114 SE1 <br />129 SE1 128 SE1 <br />150 SE1 127 SE1 <br />134 SE1 130 SE1 <br />130 SE1 127 SE1 <br />124 SE1 136 SE1 <br />121 SE1 128 SE1 <br />132 SE1 132 SE1 <br />135 SE1 136 SE1 <br />141 SE1 139 SE1 <br />140 SE1 143 SE1 <br />121 SE1 138 SE1 <br />138 SE1 140 SE1 <br />123 SE1 132 SE1 <br />122 SE1 148 SE1 <br />115 SE1 124 SE1 <br />147 SE1 129 SE1 <br />Smooth on Textured <br />800 12.0 140 BRK PASS TB Textured on Textured <br />07/15/15 TF-199 12:51 PM 94 RR 66 800 12.0 121 BRK PASS TB Textured on Textured <br />07/15/15 TF-200 12:53 PM 94 RR 66 800 12.0 134 BRK PASS TB <br />07/16/15 TF-203 1:01 PM 94 RR 68 800 12.0 155 BRK PASS AF Smooth on Smooth <br />07/15/15 TF-201 1:02 PM 92 JR 66 800 12.0 137 BRK PASS TB Smooth on Textured <br />07/15/15 TF-202 1:05 PM 92 JR 66 <br />07/16/15 TF-204 12:58 PM 94 RR 68 800 12.0 150 BRK PASS AF Smooth on Textured <br />07/16/15 TF-205 3:00 PM 92 RR 73 800 12.0 152 BRK PASS AF Smooth on Smooth <br />07/17/15 TF-206 8:30 AM 92 JR 64 800 12.0 172 BRK PASS AF Smooth on Smooth <br />07/17/15 TF-207 8:35 AM 92 JR 64 800 12.0 129 BRK PASS AF Textured on Textured <br />07/17/15 TF-208 9:03 AM 94 RR 66 800 12.0 135 BRK PASS AF Smooth on Smooth <br />07/17/15 TF-209 9:01 AM 94 RR 67 800 12.0 149 BRK PASS AF Textured on Textured <br />07/17/15 TF-210 12:00 PM 96 RR 70 800 12.0 136 BRK PASS KS Smooth on Smooth <br />07/17/15 TF-211 12:05 PM 96 RR 70 800 12.0 137 BRK PASS KS Textured on Textured <br />07/17/15 TF-212 11:15 AM 92 JR 69 800 12.0 143 BRK PASS AF Smooth on Textured <br />07/17/15 TF-213 1:18 PM 92 JR 69 800 12.0 143 BRK PASS AF Smooth on Smooth <br />07/17/15 TF-214 1:22 PM 92 JR 67 800 12.0 132 BRK PASS AF Textured on Textured <br />07/18/15 TF-215 7:53 AM 96 RR 50 800 12.0 154 BRK PASS BM Textured on Textured <br />07/18/15 TF-216 7:50 AM 96 RR 50 800 12.0 146 BRK PASS BM Textured on Textured <br />1 See Figures 3 for Modes <br />Page 12 of 39