Laserfiche WebLink
Cripple Creek & Victor Gold Mining Company <br />Squaw Gulch Valley Leach Facility-Phase 1 <br />(9,550' Bench to Completed Areas Outlined on Figure 2) <br />Geomembrane Fusion Trial Seam Summary <br />DATE SAMPLE <br />NUMBER TIME MACHINE <br />NUMBER <br />WELD <br />TECH. <br />AMBIENT <br />AIR <br />TEMPERATURE <br />(oF) <br />MACHINE SETTINGS <br />QA <br />MONITOR REMARKSMACHINE <br />TEMPERATURE <br />(oF) <br />SPEED <br />SETTING <br />(fps) <br />INSIDE PEEL <br />(Min.=100) <br />OUTSIDE PEEL <br />(Min.=100) <br />SHEAR <br />(Min.=130) <br />STENGTH <br />(ppi)MODE1 <br />10/08/14 TF-1 2:12 PM 93 JR 63 850 11.0 165 BRK PASS DW Textured on Textured <br />STENGTH <br />(ppi)MODE1 STENGTH <br />(ppi)MODE <br />TEST RESULTS <br />PASS <br />OR <br />FAIL <br />132 SE1 137 SE1 <br />129 SE1 124 SE1 <br />125 SE1 125 SE1 <br />135 SE1 135 SE1 <br />118 SE1 126 SE1 <br />126 SE1 142 SE1 <br />144 SE1 140 SE1 <br />162 SE1 153 SE1 <br />154 SE1 163 SE1 <br />158 SE1 146 SE1 <br />151 SE1 148 SE1 <br />150 SE1 143 SE1 <br />142 SE1 127 SE1 <br />143 SE1 137 SE1 <br />136 SE1 133 SE1 <br />137 SE1 138 SE1 <br />127 SE1 133 SE1 <br />134 SE1 129 SE1 <br />134 SE1 133 SE1 <br />120 SE1 128 SE1 <br />129 SE1 142 SE1 <br />127 SE1 141 SE1 <br />136 SE1 120 SE1 <br />136 SE1 145 SE1 <br />108 SE1 117 SE1 <br />121 SE1 121 SE1 <br />113 SE1 124 SE1 <br />121 SE1 120 SE1 <br />119 SE1 111 SE1 <br />123 SE1 123 SE1 <br />137 SE1 134 SE1 <br />134 SE1 123 SE1 <br />108 SE1 136 SE1 <br />133 SE1 131 SE1 <br />112 SE1 131 SE1 <br />130 SE1 128 SE107/01/15 TF-162 10:30 AM 94 RR 73 800 12.0 132 BRK PASS JR Textured on Textured <br />07/01/15 TF-160 9:55 AM 94 RR 73 800 12.0 142 BRK PASS JR Smooth on Smooth <br />07/01/15 TF-161 10:01 AM 92 JR 73 800 12.0 126 BRK PASS JR Smooth on Smooth <br />06/30/15 TF-158 1:04 PM 94 RR 84 800 12.0 129 BRK PASS PO Smooth on Smooth <br />06/30/15 TF-159 1:00 PM 94 RR 84 800 12.0 126 BRK PASS PO Textured on Textured <br />06/30/15 TF-156 3:30 PM 94 RR 76 800 12.0 149 BRK PASS AF Smooth on Textured <br />06/30/15 TF-157 1:05 PM 92 JR 84 800 12.0 126 BRK PASS PO Smooth on Smooth <br />06/30/15 TF-154 8:10 AM 92 JR 69 800 12.0 131 BRK PASS AF Textured on Textured <br />06/30/15 TF-155 3:30 PM 92 JR 76 800 12.0 148 BRK PASS AF Smooth on Textured <br />06/30/15 TF-152 8:06 AM 94 RR 70 800 12.0 132 BRK PASS AF Textured on Textured <br />06/30/15 TF-153 8:08 AM 92 JR 69 800 12.0 147 BRK PASS AF Smooth on Smooth <br />Smooth on Smooth <br />06/29/15 TF-145 1:35 PM 92 JR 46 800 12.0 144 BRK PASS GA Smooth on Smooth <br />06/29/15 TF-146 1:32 PM 94 RR 46 800 12.0 152 BRK PASS GA Textured on Textured <br />800 12.0 166 BRK PASS BM Smooth on Smooth <br />06/29/15 TF-147 1:25 PM 94 RR 46 800 12.0 152 BRK PASS GA Smooth on Smooth <br />06/29/15 TF-148 8:13 AM 94 RR 62 800 12.0 167 BRK PASS BM <br />06/30/15 TF-151 8:00 AM 94 RR 70 800 12.0 145 BRK PASS AF Smooth on Smooth <br />06/29/15 TF-149 8:24 AM 94 RR 62 800 12.0 159 BRK PASS BM Textured on Textured <br />06/29/15 TF-150 8:35 AM 92 JR 60 <br />1 See Figures 3 for Modes <br />Page 9 of 39