Laserfiche WebLink
Cripple Creek & Victor Gold Mining Company <br />Squaw Gulch Valley Leach Facility-Phase 1 <br />(9,550' Bench to Completed Areas Outlined on Figure 2) <br />Geomembrane Fusion Trial Seam Summary <br />DATE SAMPLE <br />NUMBER TIME MACHINE <br />NUMBER <br />WELD <br />TECH. <br />AMBIENT <br />AIR <br />TEMPERATURE <br />(oF) <br />MACHINE SETTINGS <br />QA <br />MONITOR REMARKSMACHINE <br />TEMPERATURE <br />(oF) <br />SPEED <br />SETTING <br />(fps) <br />INSIDE PEEL <br />(Min.=100) <br />OUTSIDE PEEL <br />(Min.=100) <br />SHEAR <br />(Min.=130) <br />STENGTH <br />(ppi)MODE1 <br />10/08/14 TF-1 2:12 PM 93 JR 63 850 11.0 165 BRK PASS DW Textured on Textured <br />STENGTH <br />(ppi)MODE1 STENGTH <br />(ppi)MODE <br />TEST RESULTS <br />PASS <br />OR <br />FAIL <br />142 SE1 141 SE1 <br />133 SE1 139 SE1 <br />153 SE1 147 SE1 <br />148 SE1 151 SE1 <br />125 SE1 151 SE1 <br />148 SE1 157 SE1 <br />152 SE1 143 SE1 <br />155 SE1 152 SE1 <br />127 SE1 142 SE1 <br />126 SE1 139 SE1 <br />152 SE1 117 SE1 <br />143 SE1 143 SE1 <br />170 SE1 179 SE1 <br />146 SE1 172 SE1 <br />132 SE1 175 SE1 <br />135 SE1 162 SE1 <br />166 SE1 145 SE1 <br />145 SE1 170 SE1 <br />170 SE1 166 SE1 <br />164 SE1 174 SE1 <br />122 SE1 138 SE1 <br />143 SE1 142 SE1 <br />152 SE1 138 SE1 <br />145 SE1 133 SE1 <br />132 SE1 105 SE1 <br />123 SE1 114 SE1 <br />130 SE1 149 SE1 <br />133 SE1 149 SE1 <br />129 SE1 128 SE1 <br />145 SE1 138 SE1 <br />135 SE1 141 SE1 <br />148 SE1 150 SE1 <br />141 SE1 150 SE1 <br />143 SE1 122 SE1 <br />140 SE1 141 SE1 <br />142 SE1 148 SE1 <br />07/12/15 TF-179 9:00 AM 92 JR 60 800 12.0 161 BRK PASS JR Textured on Textured <br />07/12/15 TF-180 8:58 AM 94 RR 62 800 12.0 175 BRK PASS JR Smooth on Smooth <br />07/11/15 TF-177 1:18 PM 92 JR 62 800 12.0 145 BRK PASS KS Textured on Textured <br />07/12/15 TF-178 8:56 AM 92 JR 60 800 12.0 163 BRK PASS JR Smooth on Smooth <br />07/11/15 TF-175 1:03 PM 94 RR 62 800 12.0 140 BRK PASS KS Textured on Textured <br />07/11/15 TF-176 1:15 PM 92 JR 62 800 12.0 147 BRK PASS KS Smooth on Smooth <br />07/10/15 TF-164 12:55 PM 92 JR 62 800 12.0 160 BRK PASS KS Smooth on Textured <br />07/10/15 TF-163 12:50 PM 92 JR 60 800 12.0 141 BRK PASS KS Textured on Textured <br />07/10/15 TF-165 12:55 PM 94 RR 62 800 12.0 160 BRK PASS KS Smooth on Smooth <br />07/10/15 TF-166 1:00 PM 92 JR 62 800 12.0 161 BRK PASS KS Smooth on Smooth <br />07/10/15 TF-167 12:57 PM 94 RR 62 800 12.0 141 BRK PASS KS Textured on Textured <br />07/10/15 TF-168 1:35 PM 94 RR 64 800 12.0 152 BRK PASS KS Smooth on Textured <br />07/11/15 TF-169 6:54 AM 92 JR 46 800 12.0 197 BRK PASS KS Smooth on Smooth <br />07/11/15 TF-170 6:52 AM 94 RR 46 800 12.0 197 BRK PASS KS Smooth on Smooth <br />07/11/15 TF-171 6:56 AM 94 RR 46 800 12.0 173 BRK PASS KS Textured on Textured <br />07/11/15 TF-172 6:54 AM 92 JR 46 800 12.0 191 BRK PASS KS Textured on Textured <br />07/11/15 TF-173 10:20 AM 92 JR 65 800 12.0 146 BRK PASS BM Smooth on Textured <br />07/11/15 TF-174 1:00 PM 94 RR 62 800 12.0 153 BRK PASS KS Smooth on Smooth <br />1 See Figures 3 for Modes <br />Page 10 of 39