Laserfiche WebLink
Cripple Creek & Victor Gold Mining Company <br />Squaw Gulch Valley Leach Facility-Phase 1 <br />(9,550' Bench to Completed Areas Outlined on Figure 2) <br />Geomembrane Fusion Trial Seam Summary <br />DATE SAMPLE <br />NUMBER TIME MACHINE <br />NUMBER <br />WELD <br />TECH. <br />AMBIENT <br />AIR <br />TEMPERATURE <br />(oF) <br />MACHINE SETTINGS <br />QA <br />MONITOR REMARKSMACHINE <br />TEMPERATURE <br />(oF) <br />SPEED <br />SETTING <br />(fps) <br />INSIDE PEEL <br />(Min.=100) <br />OUTSIDE PEEL <br />(Min.=100) <br />SHEAR <br />(Min.=130) <br />STENGTH <br />(ppi)MODE1 <br />10/08/14 TF-1 2:12 PM 93 JR 63 850 11.0 165 BRK PASS DW Textured on Textured <br />STENGTH <br />(ppi)MODE1 STENGTH <br />(ppi)MODE <br />TEST RESULTS <br />PASS <br />OR <br />FAIL <br />144 SE1 155 SE1 <br />161 SE1 160 SE1 <br />127 SE1 153 SE1 <br />123 SE1 141 SE1 <br />140 SE1 139 SE1 <br />139 SE1 142 SE1 <br />127 SE1 126 SE1 <br />129 SE1 130 SE1 <br />142 SE1 126 SE1 <br />141 SE1 139 SE1 <br />127 SE1 130 SE1 <br />128 SE1 132 SE1 <br />115 SE1 133 SE1 <br />115 SE1 123 SE1 <br />119 SE1 121 SE1 <br />114 SE1 116 SE1 <br />139 SE1 142 SE1 <br />139 SE1 147 SE1 <br />139 SE1 136 SE1 <br />135 SE1 136 SE1 <br />123 SE1 131 SE1 <br />139 SE1 124 SE1 <br />149 SE1 152 SE1 <br />148 SE1 146 SE1 <br />112 SE1 122 SE1 <br />116 SE1 124 SE1 <br />144 SE1 137 SE1 <br />152 SE1 147 SE1 <br />133 SE1 151 SE1 <br />121 SE1 150 SE1 <br />126 SE1 137 SE1 <br />144 SE1 141 SE1 <br />128 SE1 134 SE1 <br />128 SE1 127 SE1 <br />140 SE1 135 SE1 <br />140 SE1 130 SE1 <br />06/28/15 TF-141 7:58 AM 92 JR 55 800 12.0 159 BRK PASS PO Smooth on Smooth <br />06/28/15 TF-144 8:10 AM 94 RR 55 800 12.0 146 BRK PASS PO Textured on Textured <br />06/28/15 TF-142 8:14 AM 92 JR 55 800 12.0 149 BRK PASS PO Textured on Textured <br />06/28/15 TF-143 8:02 AM 94 RR 55 800 12.0 149 BRK PASS PO Smooth on Smooth <br />06/27/15 TF-139 1:43 PM 94 RR 66 800 12.0 122 BRK PASS GA Textured on Textured <br />06/27/15 TF-140 1:51 PM 94 RR 66 800 12.0 151 BRK PASS GA Smooth on Smooth <br />06/27/15 TF-137 1:42 PM 92 JR 66 800 12.0 122 BRK PASS GA Textured on Textured <br />06/27/15 TF-138 1:49 PM 92 JR 66 800 12.0 155 BRK PASS GA Smooth on Smooth <br />800 12.0 164 BRK PASS PO Smooth on Textured <br />800 12.0 156 BRK PASS PO Smooth on Smooth <br />800 12.0 139 BRK PASS MT Textured on Textured <br />06/25/15 TF-127 8:19 AM 94 RR 52 <br />06/25/15 TF-128 8:15 AM 94 RR 52 <br />06/25/15 TF-129 1:45 PM 92 JR 65 <br />Smooth on Textured <br />06/26/15 TF-130 8:20 AM 92 JR 61 800 12.0 158 BRK PASS BM Smooth on Smooth <br />06/26/15 TF-131 8:27 AM 92 JR 61 800 12.0 159 BRK PASS BM Smooth on Textured <br />800 12.0 150 BRK PASS BM Smooth on Smooth <br />06/26/15 TF-132 8:18 AM 94 RR 61 800 12.0 151 BRK PASS BM Smooth on Smooth <br />06/26/15 TF-133 8:23 AM 94 RR 61 800 12.0 139 BRK PASS BM <br />06/26/15 TF-136 12:55 PM 92 JR 64 800 12.0 159 BRK PASS BM Smooth on Smooth <br />06/26/15 TF-134 9:44 AM 94 RR 67 800 12.0 129 BRK PASS BM Textured on Textured <br />06/26/15 TF-135 12:48 PM 94 RR 64 <br />1 See Figures 3 for Modes <br />Page 8 of 39