Laserfiche WebLink
Cripple Creek & Victor Gold Mining Company <br />Squaw Gulch Valley Leach Facility-Phase 1 <br />(9,550' Bench to Completed Areas Outlined on Figure 2) <br />Geomembrane Fusion Trial Seam Summary <br />DATE SAMPLE <br />NUMBER TIME MACHINE <br />NUMBER <br />WELD <br />TECH. <br />AMBIENT <br />AIR <br />TEMPERATURE <br />(oF) <br />MACHINE SETTINGS <br />QA <br />MONITOR REMARKSMACHINE <br />TEMPERATURE <br />(oF) <br />SPEED <br />SETTING <br />(fps) <br />INSIDE PEEL <br />(Min.=100) <br />OUTSIDE PEEL <br />(Min.=100) <br />SHEAR <br />(Min.=130) <br />STENGTH <br />(ppi)MODE1 <br />10/08/14 TF-1 2:12 PM 93 JR 63 850 11.0 165 BRK PASS DW Textured on Textured <br />STENGTH <br />(ppi)MODE1 STENGTH <br />(ppi)MODE <br />TEST RESULTS <br />PASS <br />OR <br />FAIL <br />119 SE1 114 SE1 <br />120 SE1 119 SE1 <br />112 SE1 116 SE1 <br />116 SE1 114 SE1 <br />135 SE1 134 SE1 <br />122 SE1 126 SE1 <br />117 SE1 124 SE1 <br />128 SE1 119 SE1 <br />131 SE1 123 SE1 <br />122 SE1 132 SE1 <br />136 SE1 129 SE1 <br />131 SE1 124 SE1 <br />134 SE1 132 SE1 <br />141 SE1 134 SE1 <br />135 SE1 134 SE1 <br />143 SE1 138 SE1 <br />137 SE1 129 SE1 <br />140 SE1 125 SE1 <br />135 SE1 126 SE1 <br />136 SE1 129 SE1 <br />146 SE1 149 SE1 <br />150 SE1 143 SE1 <br />150 SE1 151 SE1 <br />162 SE1 149 SE1 <br />118 SE1 174 SE1 <br />118 SE1 119 SE1 <br />140 SE1 141 SE1 <br />118 SE1 132 SE1 <br />131 SE1 119 SE1 <br />121 SE1 124 SE1 <br />129 SE1 126 SE1 <br />133 SE1 154 SE1 <br />163 SE1 161 SE1 <br />133 SE1 147 SE1 <br />146 SE1 151 SE1 <br />156 SE1 154 SE1 <br />BRK PASS AF Smooth on Smooth <br />Textured on Textured <br />PASS PO <br />BRK <br />06/23/15 TF-115 7:40 AM 92 JR <br />BRK <br />72 800 12.0 130 <br />800 12.0 132 <br />Smooth on Smooth <br />06/22/15 TF-114 11:05 AM 94 RR 75 PASS PO <br />TF-110 12:55 PM 94 RR 81 <br />Smooth on Smooth <br />06/22/15 TF-113 11:01 AM 94 RR 75 800 12.0 145 <br />800 12.0 134 BRK PASS PO <br />BRK PASS PO Textured on Textured <br />06/22/15 TF-112 11:12 AM 92 JR 75 <br />Smooth on Smooth <br />06/22/15 TF-111 11:15 AM 92 JR 75 800 12.0 144 <br />800 12.0 126 BRK PASS PO <br />BRK PASS PO Smooth on Smooth <br />06/21/15 <br />06/23/15 TF-116 7:45 AM 92 JR 72 800 12.0 146 BRK PASS AF Textured on Textured <br />06/21/15 TF-109 1:12 PM 92 JR 81 800 12.0 129 <br />06/23/15 TF-117 94 JR 73 800 12.0 133 BRK PASS AF Smooth on Smooth <br />06/23/15 TF-118 <br />7:35 AM <br />94 RR 73 800 12.0 135 BRK PASS AF Textured on Textured7:40 AM <br />06/24/15 TF-119 7:00 AM 92 JR 52 800 12.0 159 BRK PASS GA Smooth on Smooth <br />06/24/15 TF-120 6:59 AM 94 RR 58 800 12.0 175 BRK PASS GA Smooth on Smooth <br />06/24/15 TF-121 1:20 PM 92 JR 83 800 12.0 142 BRK PASS PO Smooth on Smooth <br />06/24/15 TF-122 1:23 PM 92 JR 83 800 12.0 140 BRK PASS PO Smooth on Textured <br />TF-123 1:36 PM 94 RR 83 800 12.0 142 PASS PO Smooth on Smooth <br />06/24/15 TF-124 1:09 PM 94 RR 83 800 12.0 143 BRK PASS PO <br />Smooth on Textured <br />BRK PASS PO <br />Textured on Textured <br />BRK <br />06/25/15 TF-125 8:13 AM 92 JR 52 <br />06/25/15 TF-126 8:14 AM 92 JR 52 800 12.0 161 <br />Smooth on Smooth <br />BRK PASS PO <br />800 12.0 176 <br />06/24/15 <br />1 See Figures 3 for Modes <br />Page 7 of 39