Laserfiche WebLink
Cripple Creek & Victor Gold Mining Company <br />Squaw Gulch Valley Leach Facility-Phase 1 <br />(9,550' Bench to Completed Areas Outlined on Figure 2) <br />Geomembrane Fusion Trial Seam Summary <br />DATE SAMPLE <br />NUMBER TIME MACHINE <br />NUMBER <br />WELD <br />TECH. <br />AMBIENT <br />AIR <br />TEMPERATURE <br />(oF) <br />MACHINE SETTINGS <br />QA <br />MONITOR REMARKSMACHINE <br />TEMPERATURE <br />(oF) <br />SPEED <br />SETTING <br />(fps) <br />INSIDE PEEL <br />(Min.=100) <br />OUTSIDE PEEL <br />(Min.=100) <br />SHEAR <br />(Min.=130) <br />STENGTH <br />(ppi)MODE1 <br />10/08/14 TF-1 2:12 PM 93 JR 63 850 11.0 165 BRK PASS DW Textured on Textured <br />STENGTH <br />(ppi)MODE1 STENGTH <br />(ppi)MODE <br />TEST RESULTS <br />PASS <br />OR <br />FAIL <br />157 SE1 159 SE1 <br />155 SE1 161 SE1 <br />173 SE1 162 SE1 <br />169 SE1 173 SE1 <br />119 SE1 118 SE1 <br />126 SE1 129 SE1 <br />145 SE1 135 SE1 <br />130 SE1 146 SE1 <br />122 SE1 121 SE1 <br />125 SE1 122 SE1 <br />120 SE1 125 SE1 <br />126 SE1 124 SE1 <br />140 SE1 122 SE1 <br />137 SE1 128 SE1 <br />134 SE1 131 SE1 <br />139 SE1 131 SE1 <br />139 SE1 107 SE1 <br />141 SE1 120 SE1 <br />137 SE1 136 SE1 <br />131 SE1 138 SE1 <br />126 SE1 95 SE1 <br />123 SE1 -SE1 <br />123 SE1 127 SE1 <br />128 SE1 128 SE1 <br />124 SE1 119 SE1 <br />113 SE1 130 SE1 <br />123 SE1 127 SE1 <br />129 SE1 135 SE1 <br />141 SE1 156 SE1 <br />136 SE1 146 SE1 <br />130 SE1 118 SE1 <br />139 SE1 127 SE1 <br />117 SE1 125 SE1 <br />114 SE1 123 SE1 <br />110 SE1 110 SE1 <br />112 SE1 119 SE1 <br />850 15.0 148 BRK PASS PO <br />BRK PASS PO <br />06/03/15 TF-62 1:30 PM 92 JR 68 <br />06/03/15 TF-61 11:51 AM 94 RR 61 850 14.0 142 <br />850 13.0 151 BRK PASS PO <br />BRK PASS PO <br />06/03/15 TF-60 9:35 AM 92 RR 56 <br />06/03/15 TF-59 8:25 AM 94 RR 53 850 12.0 150 <br />BRK PASS BM146 <br />850 11.0 146 BRK PASS BM <br />BRK PASS BM <br />06/02/15 TF-57 2:10 PM 92 JR 65 <br />Smooth on Smooth <br />11/06/14 TF-56 9:20 AM 92 JT 42 850 8.0 207 <br />850 8.0 207 BRK PASS BM11/06/14 TF-55 8:10 AM 92 JT 37 <br />06/04/15 TF-63 8:40 AM 92 JR 62 850 11.0 161 BRK PASS AF <br />06/02/15 TF-58 2:10 PM 94 RR 65 850 11.0 <br />06/04/15 TF-64 8:43 AM 94 RR 63 854 11.0 162 BRK PASS PO <br />06/04/15 TF-65 12:54 PM 94 RR 70 851 11.0 --FAIL PO <br />06/04/15 TF-66 1:04 PM 92 JR 70 850 11.0 127 BRK PASS KS <br />06/04/15 TF-67 1:12 PM 94 RR 70 850 11.0 132 BRK PASS KS <br />06/06/15 TF-68 7:20 AM 92 JR 40 800 11.5 177 BRK PASS PO Smooth on Smooth <br />06/06/15 TF-69 7:16 AM 94 RR 40 800 11.0 181 BRK PASS BM Smooth on Smooth <br />06/06/15 TF-70 1:11 PM 94 RR 66 800 13.5 121 BRK PASS BM Textured on Textured <br />06/06/15 TF-71 1:10 PM 92 JR 66 800 12.5 147 BRK PASS BM Smooth on Smooth <br />06/06/15 TF-72 1:05 PM 94 RR 66 800 12.0 141 BRK PASS BM Smooth on Smooth <br />Textured on Textured <br />Smooth on Smooth <br />Textured on Textured <br />Textured on Textured <br />Textured on Textured <br />Textured on Textured <br />Textured on Textured <br />Textured on Textured <br />Textured on Textured <br />Textured on Textured <br />Textured on Textured <br />Textured on Textured <br />1 See Figures 3 for Modes <br />Page 4 of 39