Laserfiche WebLink
Cripple Creek & Victor Gold Mining Company <br />Squaw Gulch Valley Leach Facility-Phase 1 <br />(9,550' Bench to Completed Areas Outlined on Figure 2) <br />Geomembrane Fusion Trial Seam Summary <br />DATE SAMPLE <br />NUMBER TIME MACHINE <br />NUMBER <br />WELD <br />TECH. <br />AMBIENT <br />AIR <br />TEMPERATURE <br />(oF) <br />MACHINE SETTINGS <br />QA <br />MONITOR REMARKSMACHINE <br />TEMPERATURE <br />(oF) <br />SPEED <br />SETTING <br />(fps) <br />INSIDE PEEL <br />(Min.=100) <br />OUTSIDE PEEL <br />(Min.=100) <br />SHEAR <br />(Min.=130) <br />STENGTH <br />(ppi)MODE1 <br />10/08/14 TF-1 2:12 PM 93 JR 63 850 11.0 165 BRK PASS DW Textured on Textured <br />STENGTH <br />(ppi)MODE1 STENGTH <br />(ppi)MODE <br />TEST RESULTS <br />PASS <br />OR <br />FAIL <br />149 SE1 144 SE1 <br />158 SE1 140 SE1 <br />116 SE1 118 SE1 <br />125 SE1 119 SE1 <br />142 SE1 130 SE1 <br />143 SE1 142 SE1 <br />121 SE1 135 SE1 <br />127 SE1 129 SE1 <br />161 SE1 149 SE1 <br />152 SE1 155 SE1 <br />140 SE1 146 SE1 <br />140 SE1 145 SE1 <br />121 SE1 110 SE1 <br />122 SE1 124 SE1 <br />132 SE1 129 SE1 <br />130 SE1 123 SE1 <br />155 SE1 145 SE1 <br />147 SE1 141 SE1 <br />128 SE1 148 SE1 <br />147 SE1 141 SE1 <br />121 SE1 115 SE1 <br />122 SE1 129 SE1 <br />155 SE1 141 SE1 <br />146 SE1 158 SE1 <br />138 SE1 144 SE1 <br />153 SE1 152 SE1 <br />128 SE1 128 SE1 <br />120 SE1 115 SE1 <br />110 SE1 115 SE1 <br />118 SE1 113 SE1 <br />144 SE1 137 SE1 <br />126 SE1 127 SE1 <br />139 SE1 139 SE1 <br />142 SE1 135 SE1 <br />131 SE1 126 SE1 <br />136 SE1 133 SE1 <br />06/17/15 TF-86 1:36 PM 94 RR 64 800 12.0 131 BRK PASS GA Smooth on Smooth <br />06/17/15 TF-87 1:40 PM 92 JR 64 800 12.0 136 BRK PASS GA Smooth on Smooth <br />125 BRK PASS BM Smooth on Smooth <br />Textured on Textured <br />06/08/15 TF-76 8:11 AM 94 RR 59 800 11.0 143 Textured on Textured <br />06/07/15 TF-73 11:00 AM 92 JR 53 800 11.0 163 BRK PASS BM Smooth on Smooth <br />06/07/15 TF-74 11:15 AM 94 RR 53 800 12.0 <br />BRK PASS KS <br />46 800 12.0 170 <br />800 12.0 184 <br />BRK PASS GA <br />06/08/15 TF-75 8:04 AM 92 JR 59 800 12.0 158 BRK PASS KS <br />Textured on Textured <br />Textured on Textured <br />06/09/15 TF-78 7:27 AM 94 RR <br />06/09/15 TF-79 12:45 PM 94 RR 70 800 12.0 141 BRK PASS PO Textured on Textured <br />06/09/15 TF-77 7:20 AM 92 JR 46 BRK PASS GA <br />06/09/15 TF-80 12:51 PM 92 JR 70 800 12.0 130 BRK PASS PO Textured on Textured <br />06/10/15 TF-81 10:33 AM 94 RR 46 800 12.0 159 BRK PASS GA Smooth on Smooth <br />06/18/15 12:30 PM 94 RR 82 800 12.0 145 BRK PASS GA Smooth on SmoothTF-90 <br />06/17/15 TF-88 1:15 PM 92 JR 83 800 12.0 139 BRK PASS GA Textured on Textured <br />06/17/15 TF-89 1:20 PM 94 RR 83 800 12.0 136 BRK PASS GA Textured on Textured <br />800 12.0 160 BRK PASS GA Smooth on Smooth <br />06/10/15 TF-82 10:30 AM 92 JR 46 800 12.0 145 BRK PASS GA Smooth on Smooth <br />06/11/15 TF-85 2:45 PM 92 JR 60 800 12.0 156 BRK PASS PO Smooth on Smooth <br />06/11/15 TF-83 9:49 AM 92 JR 64 800 12.0 165 BRK PASS GA Smooth on Smooth <br />06/11/15 TF-84 9:44 AM 94 RR 64 <br />1 See Figures 3 for Modes <br />Page 5 of 39