Laserfiche WebLink
Cripple Creek & Victor Gold Mining Company <br />Squaw Gulch Valley Leach Facility-Phase 1 <br />(9,550' Bench to Completed Areas Outlined on Figure 2) <br />Geomembrane Fusion Trial Seam Summary <br />DATE SAMPLE <br />NUMBER TIME MACHINE <br />NUMBER <br />WELD <br />TECH. <br />AMBIENT <br />AIR <br />TEMPERATURE <br />(oF) <br />MACHINE SETTINGS <br />QA <br />MONITOR REMARKSMACHINE <br />TEMPERATURE <br />(oF) <br />SPEED <br />SETTING <br />(fps) <br />INSIDE PEEL <br />(Min.=100) <br />OUTSIDE PEEL <br />(Min.=100) <br />SHEAR <br />(Min.=130) <br />STENGTH <br />(ppi)MODE1 <br />10/08/14 TF-1 2:12 PM 93 JR 63 850 11.0 165 BRK PASS DW Textured on Textured <br />STENGTH <br />(ppi)MODE1 STENGTH <br />(ppi)MODE <br />TEST RESULTS <br />PASS <br />OR <br />FAIL <br />154 SE1 128 SE1 <br />167 SE1 149 SE1 <br />143 SE1 139 SE1 <br />135 SE1 138 SE1 <br />149 SE1 149 SE1 <br />141 SE1 143 SE1 <br />158 SE1 167 SE1 <br />190 SE1 169 SE1 <br />174 SE1 167 SE1 <br />163 SE1 146 SE1 <br />198 SE1 194 SE1 <br />190 SE1 202 SE1 <br />176 SE1 183 SE1 <br />174 SE1 205 SE1 <br />165 SE1 178 SE1 <br />155 SE1 172 SE1 <br />206 SE1 185 SE1 <br />185 SE1 178 SE1 <br />232 SE1 181 SE1 <br />231 SE1 179 SE1 <br />195 SE1 192 SE1 <br />191 SE1 176 SE1 <br />148 SE1 154 SE1 <br />153 SE1 163 SE1 <br />163 SE1 154 SE1 <br />150 SE1 157 SE1 <br />176 SE1 181 SE1 <br />180 SE1 183 SE1 <br />160 SE1 174 SE1 <br />166 SE1 177 SE1 <br />168 SE1 164 SE1 <br />173 SE1 181 SE1 <br />177 SE1 187 SE1 <br />179 SE1 178 SE1 <br />182 SE1 193 SE1 <br />171 SE1 160 SE1 BRK PASS DW Textured on Textured <br />Smooth on Smooth <br />11/01/14 TF-54 1:30 PM 94 JD 55 850 10.0 169 <br />850 10.0 210 BRK PASS DW <br />BRK PASS DW Smooth on Smooth <br />11/01/14 TF-53 1:25 AM 94 JD 50 <br />Textured on Textured <br />11/01/14 TF-52 1:25 PM 92 JT 50 850 9.0 207 <br />850 10.0 190 BRK PASS DW <br />BRK PASS DW Smooth on Smooth <br />11/01/14 TF-51 8:55 AM 94 JD 47 <br />Textured on Textured <br />11/01/14 TF-50 8:50 AM 92 JT 47 850 10.0 196 <br />850 10.0 207 BRK PASS DW <br />BRK PASS DW Smooth on Smooth <br />11/01/14 TF-49 8:55 AM 92 JT 47 <br />Textured on Textured <br />11/01/14 TF-48 8:50 AM 94 JD 47 850 10.0 178 <br />850 10.0 215 BRK PASS DW10/31/14 TF-47 8:50 AM 92 JT 35 <br />51 850 10.0 162 <br />850 10.0 178 <br />BRK PASS NA Textured on Textured <br />Smooth on Smooth <br />10/29/14 TF-38 1:35 PM 94 JD <br />10/29/14 TF-39 1:30 PM 94 JD 51 850 10.0 171 BRK PASS NA Smooth on Smooth <br />10/29/14 TF-37 1:12 PM 92 JR 51 BRK PASS NA <br />10/30/14 TF-40 8:55 AM 94 JD 36 850 10.0 231 BRK PASS AF Smooth on Smooth <br />10/30/14 TF-41 9:10 AM 92 JT 37 850 10.0 191 BRK PASS AF Textured on Textured <br />Textured on Textured <br />10/30/14 TF-42 9:00 AM 94 JD 38 850 10.0 217 BRK PASS AF Textured on Textured <br />10/30/14 TF-43 9:05 AM 92 JT 38 850 10.0 204 BRK PASS AF Smooth on Smooth <br />10/31/14 TF-44 8:45 AM 94 JD 35 850 10.0 207 BRK PASS DW Smooth on Smooth <br />10/31/14 8:45 AM 92 JT 35 850 10.0 232 DWTF-45 BRK PASS Smooth on Smooth <br />10/31/14 8:45 AM 94 JD 35 850 10.0 218 DWTF-46 BRK PASS <br />1 See Figures 3 for Modes <br />Page 3 of 39