Laserfiche WebLink
Cripple Creek & Victor Gold Mining Company <br />Squaw Gulch Valley Leach Facility-Phase 1 <br />(9,550' Bench to Completed Areas Outlined on Figure 2) <br />Geomembrane Fusion Trial Seam Summary <br />DATE SAMPLE <br />NUMBER TIME MACHINE <br />NUMBER <br />WELD <br />TECH. <br />AMBIENT <br />AIR <br />TEMPERATURE <br />(oF) <br />MACHINE SETTINGS <br />QA <br />MONITOR REMARKSMACHINE <br />TEMPERATURE <br />(oF) <br />SPEED <br />SETTING <br />(fps) <br />INSIDE PEEL <br />(Min.=100) <br />OUTSIDE PEEL <br />(Min.=100) <br />SHEAR <br />(Min.=130) <br />STENGTH <br />(ppi)MODE1 <br />10/08/14 TF-1 2:12 PM 93 JR 63 850 11.0 165 BRK PASS DW Textured on Textured <br />STENGTH <br />(ppi)MODE1 STENGTH <br />(ppi)MODE <br />TEST RESULTS <br />PASS <br />OR <br />FAIL <br />190 SE1 197 SE1 <br />185 SE1 171 SE1 <br />190 SE1 194 SE1 <br />194 SE1 171 SE1 <br />182 SE1 171 SE1 <br />194 SE1 181 SE1 <br />179 SE1 164 SE1 <br />172 SE1 159 SE1 <br />123 SE1 116 SE1 <br />114 SE1 114 SE1 <br />133 SE1 132 SE1 <br />142 SE1 132 SE1 <br />122 SE1 128 SE1 <br />140 SE1 133 SE1 <br />130 SE1 120 SE1 <br />143 SE1 128 SE1 <br />127 SE1 127 SE1 <br />122 SE1 124 SE1 <br />152 SE1 145 SE1 <br />158 SE1 147 SE1 <br />154 SE1 139 SE1 <br />164 SE1 149 SE1 <br />150 SE1 141 SE1 <br />157 SE1 150 SE1 <br />138 SE1 141 SE1 <br />148 SE1 140 SE1 <br />179 SE1 191 SE1 <br />186 SE1 169 SE1 <br />182 SE1 191 SE1 <br />187 SE1 158 SE1 <br />193 SE1 187 SE1 <br />184 SE1 156 SE1 <br />183 SE1 186 SE1 <br />196 SE1 158 SE1 <br />149 SE1 141 SE1 <br />139 SE1 135 SE1 <br />10/25/14 TF-19 8:00 AM 94 JD 49 850 10.0 220 BRK PASS NA Smooth on Smooth <br />10/25/14 TF-20 7:50 AM 92 JT 49 850 10.0 223 BRK NA Smooth on Smooth <br />10/25/14 TF-21 7:45 AM 94 JD 49 850 10.0 214 BRK PASS DW Textured on Textured <br />PASS <br />10/25/14 TF-22 7:55 AM 92 JT 49 850 10.0 203 BRK PASS NA Textured on Textured <br />10/25/14 TF-23 11:45 AM 92 JT 61 850 10.5 135 BRK PASS AF Textured on Smooth <br />10/25/14 TF-24 1:10 PM 94 JD 63 850 10.0 151 BRK PASS AF Smooth on Smooth <br />10/25/14 TF-25 1:15 PM 94 JD 63 850 10.0 140 BRK PASS AF Textured on Textured <br />170 BRK PASS AF Textured on Textured <br />10/25/14 TF-26 1:18 PM 92 JR 63 850 11.0 155 BRK PASS AF Smooth on Smooth <br />10/25/14 TF-27 1:36 PM 92 JR 63 850 11.0 132 BRK PASS AF Textured on Textured <br />Textured on Textured <br />10/29/14 TF-36 1:22 PM 92 JR 51 850 10.0 157 Textured on Textured <br />10/27/14 TF-28 10:35 AM 94 JD 44 850 10.0 175 BRK PASS AF Smooth on Smooth <br />10/27/14 TF-29 10:30 AM 94 JD 44 850 10.0 <br />BRK PASS NA <br />10/27/14 TF-30 11:05 AM 92 JT 46 850 10.0 161 BRK PASS AF <br />10/27/14 TF-31 11:10 AM 92 JT 46 850 <br />JT <br />10.0 151 BRK PASS AF Smooth on Smooth <br />10/29/14 TF-32 8:40 AM 92 JT <br />PASS NA Smooth on Smooth <br />850 10.0 192 BRK PASS NA Textured on Textured <br />38 850 10.0 213 BRK PASS NA Smooth on Smooth <br />38 850 10.0 206 BRK PASS NA Textured on Textured <br />38 <br />10/29/14 TF-33 8:50 AM 92 <br />TF-3410/29/14 <br />10/29/14 TF-35 8:50 AM 94 JD <br />8:45 AM 94 JD 38 850 10.0 207 BRK <br />1 See Figures 3 for Modes <br />Page 2 of 39