Laserfiche WebLink
Cripple Creek & Victor Gold Mining Company <br />Squaw Gulch Valley Leach Facility-Phase 1 <br />(9,550' Bench to Completed Areas Outlined on Figure 2) <br />Geomembrane Fusion Trial Seam Summary <br />135 SE1 130 SE1 <br />133 SE1 139 SE1 <br />155 SE1 147 SE1 <br />160 SE1 133 SE1 <br />161 SE1 172 SE1 <br />164 SE1 163 SE1 <br />174 SE1 157 SE1 <br />143 SE1 150 SE1 <br />171 SE1 154 SE1 <br />167 SE1 162 SE1 <br />158 SE1 146 SE1 <br />135 SE1 128 SE1 <br />157 SE1 155 SE1 <br />168 SE1 156 SE1 <br />140 SE1 144 SE1 <br />148 SE1 137 SE1 <br />130 SE1 119 SE1 <br />139 SE1 126 SE1 <br />141 SE1 143 SE1 <br />137 SE1 131 SE1 <br />147 SE1 149 SE1 <br />145 SE1 128 SE1 <br />180 SE1 179 SE1 <br />169 SE1 179 SE1 <br />162 SE1 171 SE1 <br />172 SE1 177 SE1 <br />179 SE1 170 SE1 <br />183 SE1 181 SE1 <br />178 SE1 165 SE1 <br />184 SE1 158 SE1 <br />129 SE1 129 SE1 <br />137 SE1 121 SE1 <br />127 SE1 124 SE1 <br />135 SE1 122 SE1 <br />129 SE1 133 SE1 <br />149 SE1 143 SE1 <br />DATE SAMPLE <br />NUMBER TIME MACHINE <br />NUMBER <br />WELD <br />TECH. <br />AMBIENT <br />AIR <br />TEMPERATURE <br />(oF) <br />MACHINE SETTINGS <br />QA <br />MONITOR REMARKSMACHINE <br />TEMPERATURE <br />(oF) <br />SPEED <br />SETTING <br />(fps) <br />INSIDE PEEL <br />(Min.=100) <br />OUTSIDE PEEL <br />(Min.=100) <br />SHEAR <br />(Min.=130) <br />STENGTH <br />(ppi)MODE1 <br />10/08/14 TF-1 2:12 PM 93 JR 63 850 11.0 165 BRK PASS DW Textured on Textured <br />STENGTH <br />(ppi)MODE1 STENGTH <br />(ppi) <br />10/08/14 TF-3 2:10 PM 92 JT 63 850 10.5 174 BRK PASS DW Smooth on Smooth <br />10/21/14 TF-4 10:30 AM 94 JD 52 850 10.0 187 BRK PASS AF Smooth on Smooth <br />10/21/14 TF-5 10:25 AM 92 JT 52 850 12.0 186 BRK PASS AF Smooth on Smooth <br />10/21/14 TF-6 10:35 AM 94 JD 52 850 10.0 174 BRK PASS AF Textured on Textured <br />10/21/14 TF-7 10:40 AM 92 JT 52 850 12.0 185 BRK PASS AF Textured on Textured <br />10/21/14 TF-8 1:20 PM 92 JT 60 850 12.5 165 BRK PASS AF Smooth on Smooth <br />10/21/14 TF-9 1:30 PM 94 JD 60 850 10.0 141 BRK PASS AF Textured on Textured <br />10/21/14 TF-10 1:30 PM 94 JD 60 850 10.0 151 BRK PASS AF Smooth on Smooth <br />10/21/14 TF-11 1:25 PM 92 JT 60 850 12.5 166 BRK PASS AF Textured on Textured <br />10/24/14 TF-12 7:55 AM 94 JD 50 850 10.0 220 BRK PASS AF Textured on Textured <br />10/24/14 TF-13 8:00 AM 94 JD 50 850 10.0 206 BRK PASS AF Smooth on Smooth <br />10/24/14 TF-14 8:05 AM 92 JT 50 850 10.0 208 BRK PASS AF Smooth on Smooth <br />10/24/14 TF-15 8:10 AM 92 JT 50 850 10.0 194 Textured on Textured <br />10/24/14 TF-16 12:55 PM 94 JD 65 BRK PASS AF <br />BRK PASS AF <br />63 850 11.0 147 <br />850 10.0 130 <br />BRK PASS AF Textured on Textured <br />Textured on Smooth <br />10/24/14 TF-17 1:20 PM 92 JT <br />10/24/14 TF-18 2:05 PM 92 JT 65 850 11.0 155 BRK PASS AF Smooth on Smooth <br />10/08/14 TF-2 2:05 PM 94 JD 63 Smooth on Smooth85010.0 178 BRK PASS DW <br />MODE <br />TEST RESULTS <br />PASS <br />OR <br />FAIL <br />1 See Figures 3 for Modes <br />Page 1 of 39