My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-01-14_REPORT - M1980244 (8)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2016-01-14_REPORT - M1980244 (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:14:33 PM
Creation date
1/15/2016 3:17:27 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
1/14/2016
Doc Name
Final Report Quality Assurance Monitoring & Test Results
From
Cripple Creek & Victor Gold Mining Company
To
DRMS
Email Name
TC1
ERR
AME
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Section 02200 Page 11 of 18 January 14, 2011 <br />Earthworks Revision 0 <br /> <br />S:\Projects\1125G Squaw Gulch Valley Leach Facililty Design\I - Tech Specs\02200.r0.doc <br />of passes shall be subject to CERTIFYING ENGINEER's approval, at no additional cost <br />to CC&V. The method SPECIFICATIONS may be changed at any time, at the discretion <br />of CERTIFYING ENGINEER, based upon changes in material characteristics, field <br />conditions, and/or compaction equipment. <br />D. Underdrain Fill <br />1. Underdrain Fill shall be placed in the Underdrains as shown in the DRAWINGS. <br />2. CONTRACTOR shall condition Underdrain Fill that results in a firm, unyielding surface <br />capable of allowing the movement of vehicles and equipment over the surface without <br />causing rutting or other deleterious effects. <br />3. CONTRACTOR shall condition, place and compact Underdrain Fill by a method <br />compaction technique. The compaction equipment shall consist of a minimum 10-ton <br />(static drum weight) vibratory smooth-drum compactor. The number of passes and loose <br />lift thickness shall be subject to CERTIFYING ENGINEER's approval, at no additional <br />cost to CC&V. The method SPECIFICATIONS may be changed at any time, at the <br />discretion of MANAGER, based upon changes in material characteristics, field conditions, <br />and/or compaction equipment. <br />4. Provisions shall be made by CONTRACTOR for removal of oversize materials from fills, <br />at no additional cost to CC&V. <br />5. The MANAGER will minimize the amount of traffic over the Underdrain Fill. <br />E. Leak Detection Fill <br />1. Leak Detection Fill shall be placed in the Leak Detection Trenches as shown on the <br />DRAWINGS. <br />2. CONTRACTOR shall condition Leak Detection Fill to allow a surface that does not cause <br />rutting or other deleterious effects. <br />F. Low Volume Solution Collection Fill <br />1. Low Volume Solution Collection Fill shall be placed over the geomembrane in the locations <br />shown on the DRAWINGS. <br />2. CONTRACTOR shall condition Low Volume Solution Collection Fill to allow a surface <br />that does not cause rutting or other deleterious effects. <br />3. CONTRACTOR shall place Low Volume Solution Collection Fill around the Low <br />Volume Solution Collection Vertical Riser Pipes in maximum 12-inch loose lifts and <br />compact using a hand operated vibratory plate compactor to the satisfaction of the <br />MANAGER and CERTIFYING ENGINEER. Low Volume Solution Collection Fill <br />shall be worked under the Low Volume Solution Collection Rise pipe haunches by hand to <br />provide uniform support of the pipe. <br />4. Prior to placing the Low Volume Solution Collection Fill, CONTRACTOR shall verify by <br />visual inspection that the underlying geosynthetics are free of holes, tears, wrinkles, or <br />foreign objects. MANAGER and CERTIFYING ENGINEER will inspect the
The URL can be used to link to this page
Your browser does not support the video tag.