My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-01-14_REPORT - M1980244 (8)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2016-01-14_REPORT - M1980244 (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:14:33 PM
Creation date
1/15/2016 3:17:27 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
1/14/2016
Doc Name
Final Report Quality Assurance Monitoring & Test Results
From
Cripple Creek & Victor Gold Mining Company
To
DRMS
Email Name
TC1
ERR
AME
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Section 02200 Page 10 of 18 January 14, 2011 <br />Earthworks Revision 0 <br /> <br />S:\Projects\1125G Squaw Gulch Valley Leach Facililty Design\I - Tech Specs\02200.r0.doc <br />or wait until subsequent temperature monitoring indicates the fill is unfrozen, at no cost to <br />CC&V. <br />11. Overburden slopes shall be compacted using a method specification and graded to meet the <br />grades and dimensions shown on the DRAWINGS. The Bedding Fill subgrade surface will <br />be prepared as identified in Section 2200 of the SPECIFICATIONS. <br />B. Structural Fill <br />1. Areas to receive Structural Fill will include, but are not limited to, slope reductions, and <br />miscellaneous site grading. <br />2. CONTRACTOR shall condition Structural Fill to a moisture content that allows <br />compaction to the required density and that results in a firm, unyielding surface capable of <br />allowing the movement of vehicles and equipment over the surface without causing rutting <br />or other deleterious effects. <br />3. CONTRACTOR shall place Structural Fill materials with less than 30 percent rock <br />materials above 3/4-inch size in maximum 12-inch loose lifts, and compact to 95 percent of <br />maximum dry density (ASTM D698). <br />4. CONTRACTOR shall condition, place and compact Structural Fill containing more than <br />30 percent rock materials above 3/4-inch size(rock fill) by a method compaction technique. <br />The compaction equipment shall consist of a minimum 10-ton (static drum weight) <br />vibratory smooth-drum compactor. The number of passes and loose lift thickness shall be <br />subject to CERTIFYING ENGINEER's approval, at no additional cost to CC&V. The <br />method SPECIFICATIONS may be changed at any time, at the discretion of <br />CERTIFYING ENGINEER, based upon changes in material characteristics, field <br />conditions, and/or compaction equipment. <br /> Maximum rock size for rock fill shall be two-thirds of the compacted lift thickness, unless <br />otherwise approved by MANAGER, DESIGN ENGINEER, and CERTIFYING <br />ENGINEER. CONTRACTOR shall remove oversize materials from fills at no additional <br />cost to CC&V. <br />C. Select Structural Fill <br />1. Select Structural Fill shall be placed for miscellaneous site grading as required by the <br />MANAGER and CERTIFYING ENGINEER. <br />2. CONTRACTOR shall condition Select Structural Fill to a moisture content that allows <br />compaction to the required density and that results in a firm, unyielding surface capable of <br />allowing the movement of vehicles and equipment over the surface without causing rutting <br />or other deleterious effects. <br />3. CONTRACTOR shall place Select Structural Fill materials with less than 30 percent rock <br />materials above 3/4-inch size in maximum 12-inch loose lifts, and compacted to 95 percent <br />of maximum dry density (ASTM D698). <br />4. CONTRACTOR shall condition and place Select Structural Fill containing more than 30 <br />percent rock materials above 3/4-inch size (rock fill) in maximum 12-inch loose lifts and <br />compact by a method compaction technique. The compaction equipment shall consist of a <br />minimum ten 10-ton (static drum weight) vibratory smooth-drum compactor. The number
The URL can be used to link to this page
Your browser does not support the video tag.