My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-01-14_REPORT - M1980244 (8)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2016-01-14_REPORT - M1980244 (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:14:33 PM
Creation date
1/15/2016 3:17:27 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
1/14/2016
Doc Name
Final Report Quality Assurance Monitoring & Test Results
From
Cripple Creek & Victor Gold Mining Company
To
DRMS
Email Name
TC1
ERR
AME
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Section 02200 Page 9 of 18 January 14, 2011 <br />Earthworks Revision 0 <br /> <br />S:\Projects\1125G Squaw Gulch Valley Leach Facililty Design\I - Tech Specs\02200.r0.doc <br />excessive gaps are left between successively dumped loads of materials. The fill shall be <br />leveled prior to compaction by means of a dozer or grader, or other suitable approved <br />equipment, to obtain a surface free from depressions. <br />7. Except in areas approved by MANAGER and CERTIFYING ENGINEER where space <br />is limited or otherwise specified, CONTRACTOR shall place fill by routing the hauling <br />and spreading units approximately parallel to the axis of the fill. As far as practical, hauling <br />units shall be so routed that they do not follow in the same paths, but split their tracks <br />evenly across the surface of the fill to enhance compaction. <br />8. CONTRACTOR shall apply water required for moisture conditioning on the fill or in the <br />borrow areas. <br /> CONTRACTOR shall maintain fill materials within the moisture content range required to <br />permit proper compaction to the specified density with the equipment being used. The <br />moisture content of the fill materials, prior to and during compaction, shall be uniform <br />throughout each layer of the material. <br /> Prior to mixing of wet and dry material on the fill to obtain the proper moisture content, <br />approval shall be obtained from CERTIFYING ENGINEER. Mixed material shall have a <br />uniform distribution of the moisture content prior to placement on the subsequent lift. <br /> When materials spread on the fill are too dry for proper compaction, CONTRACTOR <br />shall spray water on each layer of the fill and shall work the moisture into the fill by <br />harrowing or other approved means, until a uniform distribution of moisture is obtained. <br />Material that is too wet for proper compaction, as determined by CERTIFYING <br />ENGINEER, shall be removed from the fill and/or spread out and permitted to dry, assisted <br />by disking and harrowing or mixing in dry material when permitted by CERTIFYING <br />ENGINEER, if necessary, until the moisture content is reduced to an amount suitable for <br />obtaining the specified degree of compaction, at no cost to CC&V. <br />9. After each layer of fill material has been placed, spread, and moisture-conditioned, the layer <br />shall be compacted by passing compaction equipment over the entire surface of the layer a <br />sufficient number of times to obtain the required density, as specified herein. <br /> Compaction shall be accomplished with equipment and by methods approved by <br />CERTIFYING ENGINEER. If such equipment or methods are found unsatisfactory for <br />the intended use, CONTRACTOR shall replace the unsatisfactory equipment with other <br />types or adjust methods until proper compaction is achieved. Prior to placement of a <br />subsequent lift, the previous lift shall be thoroughly scarified to a nominal depth of 2-inches <br />to provide good bonding between lifts. Scarification shall be accomplished by disking, <br />raking with a grader, or an alternative method approved by CERTIFYING ENGINEER. <br />10. The CQA Monitor will measure the ambient air temperature on an hourly basis. If the <br />ambient air temperature is less than thirty-two degrees Fahrenheit for more than one hour <br />(1) over the preceding twenty-four (24) hours, the CQA Monitor will measure the <br />temperature of the fill to determine if the fill is frozen. "Frozen" is defined as a mean <br />temperature of thirty-two degrees Fahrenheit (32°F) or less. The CQA Monitor will <br />measure the temperature at a depth of three (3) inches and six (6) inches, recording the <br />lower of the two. Six (6) measurements will be taken per acre, and if the average is below <br />thirty-two degrees Fahrenheit (32°F), the fill will be considered frozen. If the fill is <br />determined to be frozen the CONTRACTOR may either remove and replace the frozen fill
The URL can be used to link to this page
Your browser does not support the video tag.