My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-01-14_REPORT - M1980244 (8)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2016-01-14_REPORT - M1980244 (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:14:33 PM
Creation date
1/15/2016 3:17:27 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
1/14/2016
Doc Name
Final Report Quality Assurance Monitoring & Test Results
From
Cripple Creek & Victor Gold Mining Company
To
DRMS
Email Name
TC1
ERR
AME
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Section 02200 Page 12 of 18 January 14, 2011 <br />Earthworks Revision 0 <br /> <br />S:\Projects\1125G Squaw Gulch Valley Leach Facililty Design\I - Tech Specs\02200.r0.doc <br />geosynthetic for wrinkles prior to placement of Low Volume Solution Collection Fill. As <br />instructed by MANAGER, CONTRACTOR shall "work out" wrinkles to the satisfaction <br />of MANAGER and CERTIFYING ENGINEER prior to placement of the Low Volume <br />Solution Collection Fill. In all cases, wrinkles shall not be of a size that they could fold <br />back on themselves. Wrinkles greater than one foot shall be removed and repaired by the <br />INSTALLER. <br />5. CONTRACTOR shall place Low Volume Solution Collection Fill in a single 36-inch <br />loose lift. The tracked equipment shall operate only over previously placed Low Volume <br />Solution Collection Fill. CONTRACTOR shall not operate equipment directly on <br />geosynthetics. Only a dozer with a ground pressure not exceeding 14.7 psi can be used to <br />place Low Volume Solution Collection Fill. Equipment used for placement will not be <br />allowed to pivot on one track (i.e., no abrupt or sharp turns). There shall be no downhill <br />placement on slopes steeper than 4H:1V. Material can be placed along contours if <br />buttressed from below. <br />6. Rubber tired construction equipment shall not be allowed to travel over the geomembrane <br />or on top of Solution Collection piping unless a thickness of at least 45 inches of Low <br />Volume Solution Collection Fill has been placed over the geomembrane and on top of <br />Solution Collection piping. The CONTRACTOR will be required to demonstrate to the <br />MANAGER, DESIGN ENGINEER and CERTIFYING ENGINEER that the <br />equipment and procedures used are not detrimental to the geomembrane and piping, at no <br />cost to CC&V. Off road haul truck traffic shall require a minimum of 60 inches for Cat <br />773 (or equivalent) of Low Volume Solution Collection Fill placed over the geomembrane <br />and solution collection piping, and a minimum of 120 inches for CAT 777 (or equivalent) <br />of Low Volume Solution Collection Fill placed over the geomembrane and solution <br />collection piping. <br />7. When placing Low Volume Solution Collection Fill the maximum acceptable drop height is <br />3 feet. <br />8. CONTRACTOR shall operate equipment in a manner that is protective of underlying <br />geosynthetics. If MANAGER or CERTIFYING ENGINEER suspects the occurrence of <br />any damage to the underlying geosynthetics, MANAGER will instruct CONTRACTOR <br />to remove Low Volume Solution Collection Fill to expose the geosynthetics. <br />CONTRACTOR shall uncover, repair any observed damage of the underlying <br />geosynthetics, in accordance with the repair requirements of Sections 02776.0 and 02777.0 <br />of these SPECIFICATIONS, and recover, at no cost to CC&V. <br />9. CONTRACTOR shall place Low Volume Solution Collection Fill at a rate such that no <br />single area of 350,000 square feet of geomembrane liner is exposed to ultraviolet light for <br />more than 180 days. <br />10. CONTRACTOR shall provide close continuous monitoring at the point of placement <br />during the placement of the Low Volume Solution Collection Fill over geosynthetics. <br />11. CONTRACTOR shall verify the final thickness of Low Volume Solution Collection Fill to <br />determine compliance with this SPECIFICATION. CONTRACTOR shall record <br />verification location, elevation, and thickness. CQA Monitor shall witness all verification <br />measurements. CONTRACTOR will submit a method of verifying Low Volume Solution <br />Collection Fill depth to MANAGER for approval. Grade markers shall be placed on a 50- <br />by-50-foot grid with additional points required for breaks in grade. CONTRACTOR shall <br />remove all grade markers under supervision of CQA Monitor after verification
The URL can be used to link to this page
Your browser does not support the video tag.