Laserfiche WebLink
Table 11 <br />Cripple Creek & Victor Mining Company <br />Squaw Gulch Valley Leach Facility-Phase 1 <br />(9,550' Bench to Completed Areas Outlined on Figure 2) <br />Nuclear Gauge Moisture-Density Testing Summary-Soil Liner Fill <br />COMPACTION <br />(%) <br />PASS/FAIL <br />FIELD <br />MOISTURE <br />CONTENT <br />(%) <br />TEST <br />NUMBER <br />DATE <br />TESTED <br />DEPTH <br />(inches)SAMPLE <br />NUMBER <br />MAX. DRY <br />DENSITY <br />(pcf) <br />LABORATORY <br />LOCATION OPTIMUM <br />MOISTURE <br />(%) <br />DRY <br />DENSITY <br />(pcf) <br />SPECIFIED <br />COMPACTION <br />(%) <br />1N364 09/10/15 N 56,392.89 E 35,475.62 10 1SLF-36-R 113.9 14.1 112.9 13.7 95 99 Pass <br />1N365 09/10/15 N 56,321.45 E 35,470.14 10 1SLF-36-R 113.9 14.1 115.8 13.4 95 100+Pass <br />1N366 09/10/15 N 56,278.72 E 35,387.76 10 1SLF-36-R 113.9 14.1 116.0 14.4 95 100+Pass <br />1N367 09/11/15 N 56,342.79 E 35,376.24 10 1SLF-36-R 113.9 14.1 116.7 14.8 95 100+Pass <br />1N368 09/11/15 N 56,443.94 E 35,379.30 10 1SLF-36-R 113.9 14.1 113.9 13.8 95 100 Pass <br />1N369 09/11/15 N 56,513.86 E 35,331.90 10 1SLF-36-R 113.9 14.1 116.1 12.1 95 100+Pass <br />1N370 09/11/15 N 56,506.17 E 35,251.31 10 1SLF-36-R 113.9 14.1 115.0 13.0 95 100+Pass <br />1N371 09/11/15 N 56,429.34 E 35,299.43 10 1SLF-36-R 113.9 14.1 116.4 13.0 95 100+Pass <br />1N372 09/11/15 N 56,346.68 E 35,303.09 10 1SLF-36-R 113.9 14.1 113.9 12.6 95 100 Pass <br />1N373 09/11/15 N 56,414.51 E 35,201.53 10 1SLF-36-R 113.9 14.1 114.9 13.0 95 100+Pass <br />1N374 09/12/15 N 55,893.20 E 35,556.40 10 1SLF-36-R 113.9 14.1 115.0 11.7 95 100+Pass <br />1N375 09/12/15 N 55,974.21 E 35,526.45 10 1SLF-36-R 113.9 14.1 114.2 15.7 95 100+Pass <br />1N376 09/12/15 N 55,992.46 E 35,435.46 10 1SLF-36-R 113.9 14.1 113.8 14.1 95 100 Pass <br />1N377 09/12/15 N 56,137.24 E 35,328.63 10 1SLF-36-R 113.9 14.1 113.8 15.5 95 100 Pass <br />1N378 09/12/15 N 56,299.21 E 35,160.36 10 1SLF-36-R 113.9 14.1 112.3 14.6 95 99 Pass <br />1N379 09/14/15 N 56,480.93 E 35,157.46 10 1SLF-36-R 113.9 14.1 117.0 13.9 95 100+Pass <br />1N380 09/14/15 N 56,460.09 E 35,188.16 10 1SLF-36-R 113.9 14.1 116.5 13.0 95 100+Pass <br />1N381 09/14/15 N 56,557.96 E 35,185.31 10 1SLF-36-R 113.9 14.1 114.9 13.7 95 100+Pass <br />1N382 09/14/15 N 56,641.06 E 35,182.89 10 1SLF-36-R 113.9 14.1 117.0 13.7 95 100+Pass <br />1N383 09/14/15 N 56,428.17 E 35,107.89 10 1SLF-36-R 113.9 14.1 115.7 12.9 95 100+Pass <br />1N384 09/15/15 N 56,396.82 E 35,055.29 10 1SLF-40-R 116.1 12.0 115.5 11.9 95 99 Pass <br />1N385 09/15/15 N 56,727.47 E 35,158.33 10 1SLF-40-R 116.1 12.0 114.8 13.4 95 99 Pass <br />1N386 09/15/15 N 56,665.82 E 35,127.73 10 1SLF-40-R 116.1 12.0 113.7 13.7 95 98 Pass <br />1N387 09/15/15 N 56,639.06 E 35,045.76 10 1SLF-40-R 116.1 12.0 118.9 12.0 95 100+Pass <br />1N388 09/15/15 N 56,549.01 E 35,042.50 10 1SLF-40-R 116.1 12.0 118.6 11.9 95 100+Pass <br />1N389 09/15/15 N 56,499.34 E 34,946.90 10 1SLF-40-R 116.1 12.0 115.7 13.0 95 100 Pass <br />1N390 09/15/15 N 56,481.33 E 35,041.41 10 1SLF-40-R 116.1 12.0 114.0 13.5 95 98 Pass <br />1N391 09/16/15 N 56,762.31 E 34,761.06 10 1SLF-40-R 116.1 12.0 113.8 11.8 95 98 Pass <br />Note: <br />Grey text reflects tests reported in approved or to be reported in <br />future Record of Construction Reports <br />Page 14 of 18