Laserfiche WebLink
Table 11 <br />Cripple Creek & Victor Mining Company <br />Squaw Gulch Valley Leach Facility-Phase 1 <br />(9,550' Bench to Completed Areas Outlined on Figure 2) <br />Nuclear Gauge Moisture-Density Testing Summary-Soil Liner Fill <br />COMPACTION <br />(%) <br />PASS/FAIL <br />FIELD <br />MOISTURE <br />CONTENT <br />(%) <br />TEST <br />NUMBER <br />DATE <br />TESTED <br />DEPTH <br />(inches)SAMPLE <br />NUMBER <br />MAX. DRY <br />DENSITY <br />(pcf) <br />LABORATORY <br />LOCATION OPTIMUM <br />MOISTURE <br />(%) <br />DRY <br />DENSITY <br />(pcf) <br />SPECIFIED <br />COMPACTION <br />(%) <br />1N336 08/31/15 N 57,118.59 E 34,857.14 10 1SLF-29-R 116.1 13.4 112.3 13.6 95 97 Pass <br />1N337 08/31/15 N 57,043.14 E 34,843.31 10 1SLF-37-R 115.6 13.8 115.3 12.7 95 100 Pass <br />1N338 08/31/15 N 56,891.90 E 34,763.53 10 1SLF-37-R 115.6 13.8 118.1 13.0 95 100+Pass <br />1N339 08/31/15 N 57,005.15 E 34,442.51 10 1SLF-38-R 114.7 14.6 118.9 14.6 95 100+Pass <br />1N340 09/01/15 N 56,137.21 E 36,373.38 10 1SLF-28-R 116.9 12.1 116.3 13.0 95 99 Pass <br />1N341 09/01/15 N 56,098.72 E 36,254.47 10 1SLF-28-R 116.9 12.1 116.7 14.3 95 100 Pass <br />1N342 09/01/15 N 56,030.67 E 36,143.90 10 1SLF-28-R 116.9 12.1 122.8 12.6 95 100+Pass <br />1N343 09/01/15 N 56,156.71 E 36,214.06 10 1SLF-28-R 116.9 12.1 116.6 14.9 95 100 Pass <br />1N344 09/01/15 N 56,204.01 E 36,315.81 10 1SLF-28-R 116.9 12.1 117.4 14.6 95 100+Pass <br />1N345 09/02/15 N 56,150.13 E 36,149.41 10 1SLF-28-R 116.9 12.1 115.9 15.3 95 99 Pass <br />1N346 09/02/15 N 56,216.99 E 36,120.12 10 1SLF-28-R 116.9 12.1 111.9 14.5 95 96 Pass <br />1N347 09/02/15 N 56,103.81 E 36,083.79 10 1SLF-39-R 113.9 14.1 113.2 14.9 95 99 Pass <br />1N348 09/02/15 N 56,159.58 E 36,043.55 10 1SLF-39-R 113.9 14.1 115.6 13.8 95 100+Pass <br />1N349 09/02/15 N 56,099.46 E 36,045.68 10 1SLF-36-R 113.9 14.1 110.9 14.5 95 97 Pass <br />1N350 09/02/15 N 56,029.38 E 36,013.66 10 1SLF-36-R 113.9 14.1 108.9 13.0 95 96 Pass <br />1N351 09/03/15 N 56,065.26 E 35,975.63 10 1SLF-36-R 113.9 14.1 115.4 14.3 95 100+Pass <br />1N352 09/03/15 N 56,142.11 E 35,952.18 10 1SLF-36-R 113.9 14.1 113.0 14.2 95 99 Pass <br />1N353 09/08/15 N 56,214.08 E 35,909.57 10 1SLF-36-R 113.9 14.1 116.4 13.6 95 100+Pass <br />1N354 09/08/15 N 56,149.26 E 35,846.04 10 1SLF-36-R 113.9 14.1 118.0 12.8 95 100+Pass <br />1N355 09/09/15 N 56,046.82 E 35,858.60 10 1SLF-36-R 113.9 14.1 113.8 13.3 95 100 Pass <br />1N356 09/09/15 N 56,128.87 E 35,800.75 10 1SLF-36-R 113.9 14.1 117.5 13.5 95 100+Pass <br />1N357 09/09/15 N 56,236.02 E 35,777.06 10 1SLF-36-R 113.9 14.1 117.2 12.9 95 100+Pass <br />1N358 09/09/15 N 56,224.32 E 35,705.19 10 1SLF-36-R 113.9 14.1 117.0 13.5 95 100+Pass <br />1N359 09/09/15 N 56,302.27 E 35,651.17 10 1SLF-36-R 113.9 14.1 110.1 11.8 95 97 Pass <br />1N360 09/09/15 N 56,193.72 E 35,589.24 10 1SLF-36-R 113.9 14.1 114.5 16.0 95 100+Pass <br />1N361 09/10/15 N 56,246.70 E 35,576.41 10 1SLF-36-R 113.9 14.1 118.9 12.6 95 100+Pass <br />1N362 09/10/15 N 56,217.85 E 35,482.82 10 1SLF-36-R 113.9 14.1 113.6 13.6 95 100 Pass <br />1N363 09/10/15 N 56,318.38 E 35,547.82 10 1SLF-36-R 113.9 14.1 115.9 14.5 95 100+Pass <br />Note: <br />Grey text reflects tests reported in approved or to be reported in <br />future Record of Construction Reports <br />Page 13 of 18