Laserfiche WebLink
Table 11 <br />Cripple Creek & Victor Mining Company <br />Squaw Gulch Valley Leach Facility-Phase 1 <br />(9,550' Bench to Completed Areas Outlined on Figure 2) <br />Nuclear Gauge Moisture-Density Testing Summary-Soil Liner Fill <br />COMPACTION <br />(%) <br />PASS/FAIL <br />FIELD <br />MOISTURE <br />CONTENT <br />(%) <br />TEST <br />NUMBER <br />DATE <br />TESTED <br />DEPTH <br />(inches)SAMPLE <br />NUMBER <br />MAX. DRY <br />DENSITY <br />(pcf) <br />LABORATORY <br />LOCATION OPTIMUM <br />MOISTURE <br />(%) <br />DRY <br />DENSITY <br />(pcf) <br />SPECIFIED <br />COMPACTION <br />(%) <br />1N308 08/25/15 N 55,914.68 E 36,164.47 10 1SLF-28-R 116.9 12.1 113.3 12.5 95 97 Pass <br />1N309 08/25/15 N 55,916.56 E 36,226.12 10 1SLF-28-R 116.9 12.1 115.2 13.1 95 99 Pass <br />1N310 08/25/15 N 55,911.88 E 36,275.82 10 1SLF-28-R 116.9 12.1 114.3 12.6 95 98 Pass <br />1N311 08/25/15 N 55,995.82 E 36,174.94 10 1SLF-28-R 116.9 12.1 114.2 10.1 95 98 Pass <br />1N312 08/25/15 N 56,443.74 E 33,990.18 10 1SLF-33-R 117.0 13.5 117.8 12.4 95 100+Pass <br />1N313 08/25/15 N 56,384.43 E 34,054.98 10 1SLF-33-R 117.0 13.5 117.3 13.3 95 100+Pass <br />1N314 08/25/15 N 56,359.97 E 34,126.07 10 1SLF-33-R 117.0 13.5 117.2 12.5 95 100+Pass <br />1N315 08/25/15 N 56,408.19 E 34,097.16 10 1SLF-33-R 117.0 13.5 117.4 11.5 95 100+Pass <br />1N316 08/25/15 N 55,966.65 E 36,192.02 10 1SLF-28-R 116.9 12.1 116.2 13.2 95 99 Pass <br />1N317 08/25/15 N 56,021.75 E 36,189.91 10 1SLF-28-R 116.9 12.1 117.5 12.9 95 100+Pass <br />1N318 08/25/15 N 56,017.33 E 36,308.47 10 1SLF-28-R 116.9 12.1 114.7 12.7 95 98 Pass <br />1N319 08/25/15 N 56,074.08 E 36,401.53 10 1SLF-28-R 116.9 12.1 115.9 10.7 95 99 Pass <br />1N320 08/26/15 N 56,398.31 E 34,292.64 10 1SLF-35-R 118.2 13.5 122.8 13.0 95 100+Pass <br />1N321 08/26/15 N 56,436.68 E 34,227.42 10 1SLF-35-R 118.2 13.5 123.1 12.4 95 100+Pass <br />1N322 08/26/15 N 56,496.59 E 34,154.77 10 1SLF-35-R 118.2 13.5 119.6 12.6 95 100+Pass <br />1N323 08/26/15 N 56,524.49 E 34,074.46 10 1SLF-35-R 118.2 13.5 115.8 13.6 95 98 Pass <br />1N324 08/26/15 N 56,592.02 E 34,177.76 10 1SLF-35-R 118.2 13.5 113.3 147.0 95 96 Pass <br />1N325 08/27/15 N 56,654.58 E 34,101.91 10 1SLF-35-R 118.2 13.5 118.3 13.4 95 100+Pass <br />1N326 08/27/15 N 56,581.13 E 34,043.66 10 1SLF-35-R 118.2 13.5 118.8 12.1 95 100+Pass <br />1N327 08/27/15 N 56,661.33 E 34,070.44 10 1SLF-35-R 118.2 13.5 120.3 13.4 95 100+Pass <br />1N328 08/28/15 N 57,106.96 E 34,424.18 10 1SLF-38-R 114.7 14.6 125.4 12.7 95 100+Pass <br />1N329 08/28/15 N 57,245.33 E 34,440.73 10 1SLF-29-R 116.1 13.4 110.6 13.8 95 95 Pass <br />1N330 08/28/15 N 57,133.88 E 34,502.82 10 1SLF-29-R 116.1 13.4 124.2 11.8 95 100+Pass <br />1N331 08/28/15 N 57,220.51 E 34,557.90 10 1SLF-29-R 116.1 13.4 115.4 13.4 95 99 Pass <br />1N332 08/28/15 N 57,299.96 E 34,634.49 10 1SLF-29-R 116.1 13.4 116.9 15.0 95 100+Pass <br />1N333 08/28/15 N 57,282.51 E 34,762.40 10 1SLF-29-R 116.1 13.4 112.7 14.3 95 97 Pass <br />1N334 08/28/15 N 57,180.87 E 34,784.52 10 1SLF-29-R 116.1 13.4 114.9 15.5 95 99 Pass <br />1N335 08/28/15 N 57,108.35 E 34,707.03 10 1SLF-29-R 116.1 13.4 119.7 13.1 95 100+Pass <br />Note: <br />Grey text reflects tests reported in approved or to be reported in <br />future Record of Construction Reports <br />Page 12 of 18