Table 11
<br />Cripple Creek & Victor Mining Company
<br />Squaw Gulch Valley Leach Facility-Phase 1
<br />(9,550' Bench to Completed Areas Outlined on Figure 2)
<br />Nuclear Gauge Moisture-Density Testing Summary-Soil Liner Fill
<br />COMPACTION
<br />(%)
<br />PASS/FAIL
<br />FIELD
<br />MOISTURE
<br />CONTENT
<br />(%)
<br />TEST
<br />NUMBER
<br />DATE
<br />TESTED
<br />DEPTH
<br />(inches)SAMPLE
<br />NUMBER
<br />MAX. DRY
<br />DENSITY
<br />(pcf)
<br />LABORATORY
<br />LOCATION OPTIMUM
<br />MOISTURE
<br />(%)
<br />DRY
<br />DENSITY
<br />(pcf)
<br />SPECIFIED
<br />COMPACTION
<br />(%)
<br />1N392 09/16/15 N 56,656.29 E 34,755.04 10 SLF-43-R 114.2 14.2 114.3 12.3 95 100+Pass
<br />1N393 09/16/15 N 56,701.11 E 35,001.96 10 SLF-43-R 114.2 14.2 116.6 12.3 95 100+Pass
<br />1N394 09/16/15 N 56,740.28 E 35,086.57 10 SLF-43-R 114.2 14.2 115.3 12.5 95 100+Pass
<br />1N395 09/16/15 N 56,644.01 E 34,920.75 10 SLF-43-R 114.2 14.2 114.2 13.1 95 100 Pass
<br />1N396 09/16/15 N 56,602.59 E 34,891.03 10 SLF-43-R 114.2 14.2 113.8 13.6 95 100 Pass
<br />1N397 09/17/15 N 56,705.95 E 34,958.77 10 SLF-43-R 114.2 14.2 117.8 12.3 95 100+Pass
<br />1N398 09/17/15 N 56,780.28 E 34,979.27 10 SLF-43-R 114.2 14.2 117.6 12.4 95 100+Pass
<br />1N399 09/17/15 N 56,816.03 E 35,001.39 10 SLF-43-R 114.2 14.2 118.3 12.2 95 100+Pass
<br />1N400 09/17/15 N 56,867.42 E 35,028.68 10 SLF-43-R 114.2 14.2 114.6 12.9 95 100+Pass
<br />1N401 09/17/15 N 56,922.86 E 35,019.55 10 SLF-43-R 114.2 14.2 112.4 13.8 95 98 Pass
<br />1N402 09/17/15 N 56,964.22 E 34,966.00 10 SLF-43-R 114.2 14.2 117.8 12.4 95 100+Pass
<br />1N403 09/17/15 N 56,809.34 E 34,811.24 10 SLF-43-R 114.2 14.2 118.3 12.2 95 100+Pass
<br />1N404 09/17/15 N 56,801.86 E 34,765.72 10 SLF-43-R 114.2 14.2 115.8 12.7 95 100+Pass
<br />1N405 09/17/15 N 56,872.25 E 34,802.43 10 1SLF-37-R 115.6 13.8 118.6 11.8 95 100+Pass
<br />1N406 09/17/15 N 56,963.67 E 34,824.08 10 1SLF-37-R 115.6 13.8 118.4 12.0 95 100+Pass
<br />1N407 09/17/15 N 57,026.63 E 34,836.54 10 1SLF-37-R 115.6 13.8 118.0 12.4 95 100+Pass
<br />1N408 09/17/15 N 57,109.51 E 34,840.82 10 1SLF-37-R 115.6 13.8 117.9 12.3 95 100+Pass
<br />1N409 09/17/15 N 56,985.33 E 34,604.82 10 1SLF-37-R 115.6 13.8 116.5 12.5 95 100+Pass
<br />1N410 09/23/15 N 57,005.98 E 34,396.56 10 1SLF-37-R 115.6 13.8 112.8 14.3 95 98 Pass
<br />1N411 09/25/15 N 57,115.97 E 34,342.42 10 1SLF-38-R 114.7 14.6 115.4 12.6 95 100+Pass
<br />1N412 09/25/15 N 57,256.95 E 34,310.50 10 1SLF-38-R 114.7 14.6 113.5 12.6 95 99 Pass
<br />1N413 09/25/15 N 57,434.34 E 34,349.12 10 1SLF-29-R 116.1 13.4 116.3 14.4 95 100+Pass
<br />1N414 09/25/15 N 57,454.54 E 34,444.85 10 1SLF-29-R 116.1 13.4 111.5 14.8 95 96 Pass
<br />1N415 09/25/15 N 57,399.79 E 34,568.05 10 1SLF-29-R 116.1 13.4 111.3 13.1 95 96 Pass
<br />1N416 09/26/15 N 57,292.22 E 34,396.92 10 1SLF-44-R 115.2 13.8 113.2 12.5 95 98 Pass
<br />1N417 09/28/15 N 57,634.91 E 34,611.52 10 1SLF-34-R 115.2 14.8 110.5 13.5 95 96 Pass
<br />1N418 09/28/15 N 57,528.91 E 34,687.26 10 1SLF-34-R 115.2 14.8 113.4 13.1 95 98 Pass
<br />1N419 09/28/15 N 57,390.79 E 34,624.53 10 1SLF-34-R 115.2 14.8 114.5 13.0 95 99 Pass
<br />Note:
<br />Grey text reflects tests reported in approved or to be reported in
<br />future Record of Construction Reports
<br />Page 15 of 18
|