Laserfiche WebLink
Table 11 <br />Cripple Creek & Victor Mining Company <br />Squaw Gulch Valley Leach Facility-Phase 1 <br />(9,550' Bench to Completed Areas Outlined on Figure 2) <br />Nuclear Gauge Moisture-Density Testing Summary-Soil Liner Fill <br />COMPACTION <br />(%) <br />PASS/FAIL <br />FIELD <br />MOISTURE <br />CONTENT <br />(%) <br />TEST <br />NUMBER <br />DATE <br />TESTED <br />DEPTH <br />(inches)SAMPLE <br />NUMBER <br />MAX. DRY <br />DENSITY <br />(pcf) <br />LABORATORY <br />LOCATION OPTIMUM <br />MOISTURE <br />(%) <br />DRY <br />DENSITY <br />(pcf) <br />SPECIFIED <br />COMPACTION <br />(%) <br />1N224 08/01/15 N 56,111.13 E 34,365.39 10 1SLF-21-R 118.0 13.5 117.0 14.5 95 99 Pass <br />1N225 08/01/15 N 56,162.44 E 34,404.32 10 1SLF-21-R 118.0 13.5 117.5 14.5 95 100 Pass <br />1N226 08/03/15 N 56,199.83 E 34,433.32 10 1SLF-24-R 117.1 14.0 114.1 14.2 95 97 Pass <br />1N227 08/03/15 N 56,277.88 E 34,402.74 10 1SLF-24-R 117.1 14.0 111.6 12.4 95 95 Pass <br />1N228 08/03/15 N 56,138.18 E 34,470.92 10 1SLF-24-R 117.1 14.0 116.7 14.4 95 100 Pass <br />1N229 08/03/15 N 56,326.59 E 34,351.34 10 1SLF-23-R 112.3 15.5 117.6 14.0 95 100+Pass <br />1N230 08/03/15 N 54,202.74 E 35,132.07 10 1SLF-24-R 117.1 14.0 118.6 13.4 95 100+Pass <br />1N231 08/03/15 N 54,211.39 E 35,199.50 10 1SLF-26-R 111.8 15.0 111.8 17.8 95 100 Pass <br />1N232 08/03/15 N 54,266.83 E 35,269.83 10 1SLF-24-R 117.1 14.0 117.3 14.2 95 100+Pass <br />1N233 08/03/15 N 56,325.77 E 34,420.33 10 1SLF-24-R 117.1 14.0 112.1 13.5 95 96 Pass <br />1N234 08/03/15 N 56,338.97 E 34,484.83 10 1SLF-24-R 117.1 14.0 114.6 15.7 95 98 Pass <br />1N235 08/03/15 N 54,284.63 E 35,361.95 10 1SLF-25-R 114.1 13.0 115.6 15.0 95 100+Pass <br />1N236 08/03/15 N 54,326.18 E 35,445.40 10 1SLF-30-R 117.8 13.1 120.1 13.4 95 100+Pass <br />1N237 08/03/15 N 54,321.11 E 35,559.37 10 1SLF-30-R 117.8 13.1 117.0 15.0 95 99 Pass <br />1N238 08/03/15 N 54,402.07 E 35,616.53 10 1SLF-30-R 117.8 13.1 118.5 13.3 95 100+Pass <br />1N239 08/04/15 N 54,422.56 E 35,534.32 10 1SLF-26-R 111.8 15.0 117.4 13.4 95 100+Pass <br />1N240 08/04/15 N 54,496.33 E 35,610.48 10 1SLF-30-R 117.8 13.1 117.6 13.5 95 100 Pass <br />1N241 08/04/15 N 56,357.04 E 34,592.52 10 1SLF-26-R 111.8 15.0 106.5 14.6 95 95 Pass <br />1N242 08/04/15 N 56,414.15 E 34,563.74 10 1SLF-23-R 112.3 15.5 106.8 17.0 95 95 Pass <br />1N243 08/04/15 N 56,401.41 E 34,501.49 10 1SLF-21-R 118.0 13.0 118.9 13.0 95 100+Pass <br />1N244 08/04/15 N 56,388.46 E 34,379.40 10 1SLF-23-R 112.3 15.5 109.3 15.0 95 97 Pass <br />1N245 08/05/15 N 56,455.09 E 34,326.77 10 1SLF-24-R 117.1 14.0 111.8 13.0 95 95 Pass <br />1N246 08/05/15 N 56,456.40 E 34,423.01 10 1SLF-21-R 118.0 13.5 117.1 15.0 95 99 Pass <br />1N247 08/05/15 N 56,512.83 E 34,513.97 10 1SLF-24-R 117.1 14.0 114.5 12.4 95 98 Pass <br />1N248 08/05/15 N 56,252.54 E 34,538.24 10 1SLF-24-R 117.1 14.0 113.1 12.8 95 97 Pass <br />1N249 08/05/15 N 56,627.31 E 34,505.22 10 1SLF-22-R 111.3 13.3 109.4 13.1 95 98 Pass <br />1N250 08/05/15 N 56,565.58 E 34,436.65 10 1SLF-24-R 117.1 14.0 116.3 12.8 95 99 Pass <br />1N251 08/05/15 N 56,565.66 E 34,299.20 10 1SLF-22-R 111.3 13.3 111.0 13.7 95 100 Pass <br />Note: <br />Grey text reflects tests reported in approved or to be reported in <br />future Record of Construction Reports <br />Page 9 of 18