Laserfiche WebLink
Table 11 <br />Cripple Creek & Victor Mining Company <br />Squaw Gulch Valley Leach Facility-Phase 1 <br />(9,550' Bench to Completed Areas Outlined on Figure 2) <br />Nuclear Gauge Moisture-Density Testing Summary-Soil Liner Fill <br />COMPACTION <br />(%) <br />PASS/FAIL <br />FIELD <br />MOISTURE <br />CONTENT <br />(%) <br />TEST <br />NUMBER <br />DATE <br />TESTED <br />DEPTH <br />(inches)SAMPLE <br />NUMBER <br />MAX. DRY <br />DENSITY <br />(pcf) <br />LABORATORY <br />LOCATION OPTIMUM <br />MOISTURE <br />(%) <br />DRY <br />DENSITY <br />(pcf) <br />SPECIFIED <br />COMPACTION <br />(%) <br />1N168 07/15/15 N 56,917.12 E 34,382.64 10 1SLF-15-R 116.6 12.1 116.5 13.5 95 100 Pass <br />1N169 07/15/15 N 54,620.62 E 35,227.85 10 1SLF-15-R 116.6 12.1 116.1 14.1 95 100 Pass <br />1N170 07/15/15 N 54,585.55 E 35,311.33 10 1SLF-9-R 113.9 15.3 113.6 14.2 95 100 Pass <br />1N171 07/15/15 N 54,579.89 E 35,439.34 10 1SLF-7-R 120.5 12.1 121.9 12.3 95 100+Pass <br />1N172 07/15/15 N 54,719.82 E 35,353.24 10 1SLF-7-R 120.5 12.1 121.1 12.4 95 100+Pass <br />1N173 07/15/15 N 54,778.86 E 35,339.30 10 1SLF-15-R 116.6 12.1 115.4 14.0 95 99 Pass <br />1N174 07/17/15 N 54,751.87 E 35,450.20 10 1SLF-7-R 120.5 13.4 115.2 14.1 95 96 Pass <br />1N175 07/17/15 N 54,641.21 E 35,551.06 10 1SLF-7-R 120.5 13.4 117.9 13.3 95 98 Pass <br />1N176 07/17/15 N 54,919.38 E 35,636.58 10 1SLF-7-R 120.5 13.4 116.0 15.2 95 96 Pass <br />1N177 07/17/15 N 54,934.53 E 35,512.36 10 1SLF-7-R 120.5 13.4 116.0 11.9 95 96 Pass <br />1N178 07/17/15 N 55,013.81 E 35,584.45 10 1SLF-17-R 115.9 13.4 117.1 11.4 95 100+Pass <br />1N179 07/19/15 N 54,843.81 E 35,753.72 10 1SLF-7-R 120.5 12.1 119.5 11.7 95 99 Pass <br />1N180 07/19/15 N 54,945.43 E 35,782.28 10 1SLF-7-R 120.5 12.1 121.3 12.5 95 100+Pass <br />1N181 07/19/15 N 55,083.86 E 35,719.62 10 1SLF-7-R 120.5 12.1 121.2 14.6 95 100+Pass <br />1N182 07/19/15 N 55,111.75 E 35,572.96 10 1SLF-7-R 120.5 12.1 119.9 13.3 95 100 Pass <br />1N183 07/19/15 N 55,000.72 E 35,879.13 10 1SLF-17-R 115.9 13.4 116.2 12.1 95 100+Pass <br />1N184 07/20/15 N 55,175.29 E 35,730.64 10 1SLF-17-R 115.9 13.4 115.0 13.6 95 99 Pass <br />1N185 07/22/15 N 55,125.71 E 35,865.24 10 1SLF-17-R 115.9 13.4 114.0 12.6 95 98 Pass <br />1N186 07/22/15 N 55,226.94 E 35,888.37 10 1SLF-17-R 115.9 13.4 110.7 13.5 95 96 Pass <br />1N187 07/23/15 N 55,386.85 E 35,713.99 10 1SLF-7-R 120.5 12.1 117.9 11.7 95 98 Pass <br />1N188 07/23/15 N 55,449.99 E 35,698.18 10 1SLF-12-R 115.6 14.2 114.3 14.5 95 99 Pass <br />1N189 07/23/15 N 55,532.92 E 35,631.75 10 1SLF-12-R 115.6 14.2 111.3 14.0 95 96 Pass <br />1N190 07/23/15 N 55,568.87 E 35,524.34 10 1SLF-12-R 115.6 14.2 112.6 14.3 95 97 Pass <br />1N191 07/24/15 N 55,558.01 E 35,837.76 10 1SLF-11-R 114.6 14.1 110.1 12.5 95 96 Pass <br />1N192 07/24/15 N 55,638.52 E 35,826.14 10 1SLF-11-R 114.6 14.1 115.6 13.5 95 100+Pass <br />1N193 07/24/15 N 55,720.77 E 35,733.15 10 1SLF-16-R 112.9 14.4 108.8 14.6 95 96 Pass <br />1N194 07/24/15 N 55,718.37 E 35,644.77 10 1SLF-11-R 114.6 14.1 114.2 16.1 95 100 Pass <br />1N195 07/27/15 N 55,840.64 E 35,630.33 10 1SLF-19-R 116.8 13.9 112.8 14.9 95 97 Pass <br />Note: <br />Grey text reflects tests reported in approved or to be reported in <br />future Record of Construction Reports <br />Page 7 of 18