Laserfiche WebLink
Table 11 <br />Cripple Creek & Victor Mining Company <br />Squaw Gulch Valley Leach Facility-Phase 1 <br />(9,550' Bench to Completed Areas Outlined on Figure 2) <br />Nuclear Gauge Moisture-Density Testing Summary-Soil Liner Fill <br />COMPACTION <br />(%) <br />PASS/FAIL <br />FIELD <br />MOISTURE <br />CONTENT <br />(%) <br />TEST <br />NUMBER <br />DATE <br />TESTED <br />DEPTH <br />(inches)SAMPLE <br />NUMBER <br />MAX. DRY <br />DENSITY <br />(pcf) <br />LABORATORY <br />LOCATION OPTIMUM <br />MOISTURE <br />(%) <br />DRY <br />DENSITY <br />(pcf) <br />SPECIFIED <br />COMPACTION <br />(%) <br />1N140 06/30/15 N 56,380.97 E 34,787.22 10 1SLF-15-R 116.6 12.1 115.1 13.5 95 99 Pass <br />1N141 06/30/15 N 56,413.92 E 34,699.08 10 1SLF-15-R 116.6 12.1 120.8 12.9 95 100+Pass <br />1N142 06/30/15 N 56,366.91 E 34,974.39 10 1SLF-15-R 116.6 12.1 114.3 15.7 95 98 Pass <br />1N143 06/30/15 N 56,368.09 E 34,872.70 10 1SLF-15-R 116.6 12.1 114.6 14.1 95 98 Pass <br />1N144 07/01/15 N 56,417.41 E 34,931.93 10 1SLF-12-R 115.6 14.2 112.7 15.4 95 97 Pass <br />1N145 07/01/15 N 56,472.78 E 34,833.70 10 1SLF-12-R 115.6 14.2 112.0 16.0 95 97 Pass <br />1N146 07/01/15 N 56,488.54 E 34,701.28 10 1SLF-12-R 115.6 14.2 114.0 13.8 95 99 Pass <br />1N147 07/02/15 N 56,507.53 E 34,597.57 10 1SLF-7-R 120.5 12.1 118.9 13.2 95 99 Pass <br />1N148 07/11/15 N 56,587.98 E 34,751.06 10 1SLF-12-R 115.6 14.2 112.5 14.1 95 97 Pass <br />1N149 07/11/15 N 56,626.01 E 34,644.38 10 1SLF-12-R 115.6 14.2 113.4 12.5 95 98 Pass <br />1N150 07/11/15 N 56,646.60 E 34,556.33 10 1SLF-15-R 116.6 12.1 113.0 14.4 95 97 Pass <br />1N151 07/11/15 N 56,694.96 E 34,557.81 10 1SLF-15-R 116.6 12.1 113.9 14.8 95 98 Pass <br />1N152 07/11/15 N 56,725.74 E 34,647.98 10 1SLF-15-R 116.6 12.1 117.4 14.6 95 100+Pass <br />1N153 07/11/15 N 56,765.38 E 34,573.26 10 1SLF-15-R 116.6 12.1 114.0 12.6 95 98 Pass <br />1N154 07/11/15 N 54,212.35 E 34,824.18 10 1SLF-15-R 116.6 12.1 113.6 14.5 95 97 Pass <br />1N155 07/11/15 N 54,311.91 E 34,904.04 10 1SLF-15-R 116.6 12.1 113.6 15.3 95 97 Pass <br />1N156 07/13/15 N 54,222.39 E 34,892.06 10 1SLF-9-R 113.9 15.3 109.6 14.7 95 96 Pass <br />1N157 07/13/15 N 54,226.00 E 35,045.26 10 1SLF-8-R 120.5 11.7 118.4 13.4 95 98 Pass <br />1N158 07/13/15 N 54,282.51 E 35,035.75 10 1SLF-8-R 120.5 11.7 118.8 12.7 95 99 Pass <br />1N159 07/14/15 N 54,374.76 E 35,013.83 10 1SLF-6-R 115.2 15.1 115.7 14.1 95 100+Pass <br />1N160 07/14/15 N 54,255.76 E 35,114.52 10 1SLF-6-R 115.2 15.1 115.3 14.1 95 100+Pass <br />1N161 07/14/15 N 54,362.73 E 35,099.31 10 1SLF-8-R 120.5 11.7 118.3 12.7 95 98 Pass <br />1N162 07/14/15 N 54,444.66 E 35,075.51 10 1SLF-8-R 120.5 11.7 118.8 11.7 95 99 Pass <br />1N163 07/14/15 N 54,533.68 E 35,084.00 10 1SLF-8-R 120.5 11.7 118.3 13.5 95 98 Pass <br />1N164 07/14/15 N 54,543.20 E 35,209.89 10 1SLF-8-R 120.5 11.7 119.7 13.2 95 99 Pass <br />1N165 07/14/15 N 54,353.80 E 35,227.53 10 1SLF-8-R 120.5 11.7 118.1 13.4 95 98 Pass <br />1N166 07/14/15 N 56,824.87 E 34,524.44 10 1SLF-8-R 120.5 11.7 119.6 12.9 95 99 Pass <br />1N167 07/15/15 N 56,837.19 E 34,457.59 10 1SLF-15-R 116.6 12.1 116.3 14.0 95 100 Pass <br />Note: <br />Grey text reflects tests reported in approved or to be reported in <br />future Record of Construction Reports <br />Page 6 of 18