Table 11
<br />Cripple Creek & Victor Mining Company
<br />Squaw Gulch Valley Leach Facility-Phase 1
<br />(9,550' Bench to Completed Areas Outlined on Figure 2)
<br />Nuclear Gauge Moisture-Density Testing Summary-Soil Liner Fill
<br />COMPACTION
<br />(%)
<br />PASS/FAIL
<br />FIELD
<br />MOISTURE
<br />CONTENT
<br />(%)
<br />TEST
<br />NUMBER
<br />DATE
<br />TESTED
<br />DEPTH
<br />(inches)SAMPLE
<br />NUMBER
<br />MAX. DRY
<br />DENSITY
<br />(pcf)
<br />LABORATORY
<br />LOCATION OPTIMUM
<br />MOISTURE
<br />(%)
<br />DRY
<br />DENSITY
<br />(pcf)
<br />SPECIFIED
<br />COMPACTION
<br />(%)
<br />1N85 06/10/15 N 55,699.12 E 34,076.77 10 1SLF-8-R 120.5 15.3 119.8 13.3 95 99 Pass
<br />1N86 06/10/15 N 55,723.15 E 34,156.79 10 1SLF-6-R 115.5 15.3 114.9 14.2 95 99 Pass
<br />1N87 06/11/15 N 55,970.91 E 34,118.25 10 1SLF-8-R 120.5 15.3 114.5 15.1 95 95 Pass
<br />1N88 06/11/15 N 55,914.02 E 34,178.30 10 1SLF-8-R 120.5 15.3 119.5 15.1 95 99 Pass
<br />1N89 06/11/15 N 55,852.67 E 34,213.38 10 1SLF-8-R 120.5 15.3 114.9 14.3 95 95 Pass
<br />1N90 06/11/15 N 55,925.80 E 34,237.29 10 1SLF-8-R 120.5 15.3 118.7 13.3 95 99 Pass
<br />1N91 06/19/15 N 55,816.21 E 34,359.61 10 1SLF-10-R 113.0 14.6 115.6 12.6 95 100+Pass
<br />1N92 06/19/15 N 55,884.07 E 34,359.21 10 1SLF-10-R 113.0 14.6 113.9 14.6 95 100+Pass
<br />1N93 06/19/15 N 55,636.51 E 34,607.94 10 1SLF-10-R 113.0 14.6 116.5 13.6 95 100+Pass
<br />1N94 06/19/15 N 55,706.54 E 34,672.73 10 1SLF-10-R 113.0 14.6 114.3 13.9 95 100+Pass
<br />1N95 06/19/15 N 55,743.85 E 34,592.99 10 1SLF-10-R 113.0 14.6 114.6 13.4 95 100+Pass
<br />1N96 06/19/15 N 55,847.20 E 34,563.55 10 1SLF-10-R 113.0 14.6 113.7 13.4 95 100+Pass
<br />1N97 06/20/15 N 55,795.43 E 34,777.23 10 1SLF-9-R 113.9 15.3 112.2 13.5 95 99 Pass
<br />1N98 06/20/15 N 55,847.17 E 34,762.56 10 1SLF-9-R 113.9 15.3 111.1 13.9 95 98 Pass
<br />1N99 06/20/15 N 55,891.91 E 34,742.19 10 1SLF-9-R 113.9 15.3 109.0 14.1 95 96 Pass
<br />1N100 06/20/15 N 55,833.21 E 34,694.87 10 1SLF-9-R 113.9 15.3 110.0 13.9 95 97 Pass
<br />1N101 06/20/15 N 55,873.90 E 34,675.97 10 1SLF-9-R 113.9 15.3 109.4 13.4 95 96 Pass
<br />1N102 06/20/15 N 55,889.99 E 34,647.94 10 1SLF-9-R 113.9 15.3 110.5 13.5 95 97 Pass
<br />1N103 06/20/15 N 55,963.58 E 34,670.70 10 1SLF-9-R 113.9 15.3 109.3 13.9 95 96 Pass
<br />1N104 06/21/15 N 55,833.47 E 34,825.93 10 1SLF-9-R 113.9 15.3 114.3 14.2 95 100+Pass
<br />1N105 06/21/15 N 55,889.38 E 34,799.48 10 1SLF-9-R 113.9 15.3 114.5 14.2 95 100+Pass
<br />1N106 06/21/15 N 55,860.90 E 34,732.42 10 1SLF-9-R 113.9 15.3 133.5 14.0 95 100+Pass
<br />1N107 06/21/15 N 55,945.89 E 34,744.00 10 1SLF-9-R 113.9 15.3 114.1 14.4 95 100+Pass
<br />1N108 06/21/15 N 55,973.08 E 34,675.32 10 1SLF-9-R 113.9 15.3 108.2 13.4 95 95 Pass
<br />1N109 06/21/15 N 56,004.05 E 34,716.45 10 1SLF-9-R 113.9 15.3 109.1 13.5 95 96 Pass
<br />1N110 06/22/15 N 55,997.73 E 34,906.16 10 1SLF-9-R 113.9 15.3 114.6 14.2 95 100+Pass
<br />1N111 06/22/15 N 55,997.51 E 34,856.95 10 1SLF-9-R 113.9 15.3 113.8 14.3 95 100 Pass
<br />1N112 06/22/15 N 56,067.45 E 34,824.93 10 1SLF-9-R 113.9 15.3 113.3 14.5 95 99 Pass
<br />Note:
<br />Grey text reflects tests reported in approved or to be reported in
<br />future Record of Construction Reports
<br />Page 4 of 18
|