Laserfiche WebLink
Table 11 <br />Cripple Creek & Victor Mining Company <br />Squaw Gulch Valley Leach Facility-Phase 1 <br />(9,550' Bench to Completed Areas Outlined on Figure 2) <br />Nuclear Gauge Moisture-Density Testing Summary-Soil Liner Fill <br />COMPACTION <br />(%) <br />PASS/FAIL <br />FIELD <br />MOISTURE <br />CONTENT <br />(%) <br />TEST <br />NUMBER <br />DATE <br />TESTED <br />DEPTH <br />(inches)SAMPLE <br />NUMBER <br />MAX. DRY <br />DENSITY <br />(pcf) <br />LABORATORY <br />LOCATION OPTIMUM <br />MOISTURE <br />(%) <br />DRY <br />DENSITY <br />(pcf) <br />SPECIFIED <br />COMPACTION <br />(%) <br />1N57 06/04/15 N 55,492.80 E 34,328.15 10 1SLF-4-R 115.4 13.3 113.6 12.9 95 98 Pass <br />1N58 06/04/15 N 55,537.02 E 34,303.33 10 1SLF-4-R 115.4 13.3 114.7 12.2 95 99 Pass <br />1N59 06/04/15 N 55,585.81 E 34,238.85 10 1SLF-4-R 115.4 13.3 113.6 15.3 95 98 Pass <br />1N60 06/04/15 N 55,592.89 E 34,183.24 10 1SLF-4-R 115.4 13.3 113.3 14.3 95 98 Pass <br />1N61 06/05/15 N 55,510.43 E 34,364.38 10 1SLF-4-R 115.4 13.3 116.3 13.8 95 100+Pass <br />1N62 06/05/15 N 55,613.54 E 34,319.62 10 1SLF-4-R 115.4 13.3 115.1 14.0 95 100 Pass <br />1N63 06/05/15 N 55,593.56 E 34,377.32 10 1SLF-4-R 115.4 13.3 114.6 11.5 95 99 Pass <br />1N64 06/05/15 N 55,511.63 E 34,449.83 10 1SLF-4-R 115.4 13.3 114.4 13.6 95 99 Pass <br />1N65 06/06/15 N 55,582.18 E 34,479.28 10 1SLF-4-R 115.4 13.3 114.3 12.2 95 99 Pass <br />1N66 06/06/15 N 55,664.12 E 34,483.16 10 1SLF-4-R 115.4 13.3 114.3 13.0 95 99 Pass <br />1N67 06/06/15 N 55,658.68 E 34,436.33 10 1SLF-4-R 115.4 13.3 114.8 14.1 95 99 Pass <br />1N68 06/06/15 N 55,690.64 E 34,396.42 10 1SLF-4-R 115.4 13.3 114.7 13.6 95 99 Pass <br />1N69 06/06/15 N 55,738.10 E 34,499.08 10 1SLF-4-R 115.4 13.3 113.3 13.8 95 98 Pass <br />1N70 06/06/15 N 55,655.05 E 34,564.35 10 1SLF-4-R 115.4 13.3 113.6 14.6 95 98 Pass <br />1N71 06/08/15 N 55,253.23 E 33,929.34 10 1SLF-6-R 115.5 15.1 114.5 14.5 95 99 Pass <br />1N72 06/08/15 N 55,317.56 E 33,925.15 10 1SLF-6-R 115.5 15.1 115.3 13.8 95 100 Pass <br />1N73 06/08/15 N 55,376.35 E 33,924.11 10 1SLF-6-R 115.5 15.1 115.2 14.2 95 100 Pass <br />1N74 06/08/15 N 55,492.66 E 34,078.89 10 1SLF-6-R 115.5 15.1 113.6 15.0 95 98 Pass <br />1N75 06/08/15 N 55,473.49 E 34,014.37 10 1SLF-6-R 115.5 15.1 113.2 16.5 95 98 Pass <br />1N76 06/08/15 N 55,441.18 E 33,970.51 10 1SLF-6-R 115.5 15.1 114.7 13.3 95 99 Pass <br />1N77 06/09/15 N 55,532.52 E 34,088.13 10 1SLF-6-R 115.5 15.1 114.3 14.9 95 99 Pass <br />1N78 06/09/15 N 55,582.28 E 34,042.37 10 1SLF-6-R 115.5 15.1 114.3 15.5 95 99 Pass <br />1N79 06/09/15 N 55,628.86 E 34,009.25 10 1SLF-6-R 115.5 15.1 114.7 13.3 95 99 Pass <br />1N80 06/09/15 N 55,628.63 E 34,118.35 10 1SLF-6-R 115.5 15.1 114.7 14.9 95 99 Pass <br />1N81 06/10/15 N 55,364.73 E 35,454.36 10 1SLF-8-R 120.5 11.7 117.5 15.5 95 98 Pass <br />1N82 06/10/15 N 55,454.36 E 35,525.21 10 1SLF-6-R 115.5 15.1 115.1 15.2 95 100 Pass <br />1N83 06/10/15 N 55,828.96 E 34,011.14 10 1SLF-9-R 113.9 15.3 112.0 14.5 95 98 Pass <br />1N84 06/10/15 N 55,765.46 E 34,035.51 10 1SLF-9-R 113.9 15.3 109.1 14.1 95 96 Pass <br />Note: <br />Grey text reflects tests reported in approved or to be reported in <br />future Record of Construction Reports <br />Page 3 of 18