Laserfiche WebLink
Table 11 <br />Cripple Creek & Victor Mining Company <br />Squaw Gulch Valley Leach Facility-Phase 1 <br />(9,550' Bench to Completed Areas Outlined on Figure 2) <br />Nuclear Gauge Moisture-Density Testing Summary-Soil Liner Fill <br />COMPACTION <br />(%) <br />PASS/FAIL <br />FIELD <br />MOISTURE <br />CONTENT <br />(%) <br />TEST <br />NUMBER <br />DATE <br />TESTED <br />DEPTH <br />(inches)SAMPLE <br />NUMBER <br />MAX. DRY <br />DENSITY <br />(pcf) <br />LABORATORY <br />LOCATION OPTIMUM <br />MOISTURE <br />(%) <br />DRY <br />DENSITY <br />(pcf) <br />SPECIFIED <br />COMPACTION <br />(%) <br />1N29 10/29/14 N 54,951.15 E 35,393.71 10 1SLF-1-R 113.9 13.6 112.2 13.3 95 99 Pass <br />1N30 10/29/14 N 55,021.69 E 35,394.95 10 1SLF-1-R 113.9 13.6 111.8 14.1 95 98 Pass <br />1N31 10/30/14 N 55,112.59 E 35,313.85 10 1SLF-2-R 115.8 13.8 113.2 13.0 95 98 Pass <br />1N32 10/30/14 N 55,021.30 E 35,457.18 10 1SLF-1-R 113.9 13.6 113.6 12.3 95 100 Pass <br />1N33 10/30/14 N 55,069.79 E 35,486.97 10 1SLF-1-R 113.9 13.6 112.8 12.6 95 99 Pass <br />1N34 10/30/14 N 55,116.38 E 35,407.36 10 1SLF-1-R 113.9 13.6 113.2 13.1 95 99 Pass <br />1N35 10/30/14 N 55,173.12 E 35,385.48 10 1SLF-1-R 113.9 13.6 113.9 13.2 95 100 Pass <br />1N36 10/30/14 N 55,238.24 E 35,418.53 10 1SLF-3-R 115.7 13.7 110.9 12.5 95 96 Pass <br />1N37 10/30/14 N 55,167.33 E 35,487.75 10 1SLF-1-R 113.9 13.6 112.7 12.3 95 99 Pass <br />1N38 10/31/14 N 55,268.04 E 35,412.30 10 1SLF-1-R 113.9 13.6 113.6 11.9 95 100 Pass <br />1N39 10/31/14 N 55,267.49 E 35,533.72 10 1SLF-1-R 113.9 13.6 113.1 12.1 95 99 Pass <br />1N40 10/31/14 N 55,208.21 E 35,506.64 10 1SLF-1-R 113.9 13.6 113.2 12.0 95 99 Pass <br />1N41 11/01/14 N 55,214.72 E 35,551.42 10 1SLF-2-R 115.8 13.8 114.6 13.6 95 99 Pass <br />1N42 11/01/14 N 55,265.93 E 35,640.36 10 1SLF-2-R 115.8 13.8 115.2 14.1 95 99 Pass <br />1N43 11/01/14 N 55,404.91 E 35,585.86 10 1SLF-2-R 115.8 13.8 114.8 13.2 95 99 Pass <br />1N44 11/01/14 N 54,336.69 E 34,434.27 10 1SLF-2-R 115.8 13.8 110.6 12.0 95 96 Pass <br />1N45 05/31/15 N 55,146.10 E 34,149.47 10 1SLF-5-R 115.5 12.7 114.9 15.2 95 99 Pass <br />1N46 05/31/15 N 55,090.73 E 34,120.06 10 1SLF-5-R 115.5 12.7 115.1 15.3 95 100 Pass <br />1N47 05/31/15 N 55,226.84 E 34,048.22 10 1SLF-5-R 115.5 12.7 115.4 13.9 95 100 Pass <br />1N48 05/31/15 N 55,234.24 E 34,095.13 10 1SLF-5-R 115.5 12.7 113.8 15.7 95 99 Pass <br />1N49 05/31/15 N 55,216.62 E 34,199.56 10 1SLF-5-R 115.5 12.7 114.3 13.8 95 99 Pass <br />1N50 06/02/15 N 55,255.10 E 34,272.06 10 1SLF-4-R 115.4 13.3 115.1 15.3 95 100 Pass <br />1N51 06/02/15 N 55,261.79 E 34,186.86 10 1SLF-4-R 115.4 13.3 115.3 13.9 95 100 Pass <br />1N52 06/02/15 N 55,370.98 E 34,142.21 10 1SLF-4-R 115.4 13.3 114.9 16.0 95 100 Pass <br />1N53 06/02/15 N 55,442.53 E 34,134.86 10 1SLF-4-R 115.4 13.3 115.2 14.9 95 100 Pass <br />1N54 06/03/15 N 55,375.78 E 34,294.11 10 1SLF-4-R 115.4 13.3 115.1 13.5 95 100 Pass <br />1N55 06/03/15 N 55,479.95 E 34,268.68 10 1SLF-4-R 115.4 13.3 113.1 13.8 95 98 Pass <br />1N56 06/04/15 N 55,438.35 E 34,346.67 10 1SLF-4-R 115.4 13.3 115.1 13.2 95 100 Pass <br />Note: <br />Grey text reflects tests reported in approved or to be reported in <br />future Record of Construction Reports <br />Page 2 of 18