Laserfiche WebLink
Table 11 <br />Cripple Creek & Victor Mining Company <br />Squaw Gulch Valley Leach Facility-Phase 1 <br />(9,550' Bench to Completed Areas Outlined on Figure 2) <br />Nuclear Gauge Moisture-Density Testing Summary-Soil Liner Fill <br />1N1 10/04/14 N 54,256.58 E 34,646.38 8 INFO Only 113.9 13.6 112.5 14.9 95 99 Pass <br />1N2 10/04/14 N 54,336.90 E 34,649.99 8 INFO Only 113.9 13.6 110.1 13.1 95 97 Pass <br />1N3 10/04/14 N 54,432.85 E 34,752.30 8 INFO Only 113.9 13.6 118.2 13.5 95 100+Pass <br />1N4 10/08/14 N 54,318.58 E 34,564.06 10 1SLF-1-R 113.9 13.6 113.8 11.8 95 100 Pass <br />1N5 10/08/14 N 54,345.40 E 34,671.96 10 1SLF-1-R 113.9 13.6 113.9 11.8 95 100 Pass <br />1N6 10/18/14 N 54,426.22 E 34,689.34 10 1SLF-1-R 113.9 13.6 108.9 11.8 95 96 Pass <br />1N7 10/18/14 N 54,420.08 E 34,739.58 10 1SLF-1-R 113.9 13.6 113.1 12.0 95 99 Pass <br />1N8 10/18/14 N 54,493.05 E 34,725.23 10 1SLF-1-R 113.9 13.6 112.8 11.9 95 99 Pass <br />1N9 10/20/14 N 54,322.55 E 34,762.85 10 1SLF-1-R 113.9 13.6 109.8 12.0 95 96 Pass <br />1N10 10/20/14 N 54,364.88 E 34,828.70 10 1SLF-1-R 113.9 13.6 113.1 12.1 95 99 Pass <br />1N11 10/23/14 N 54,430.61 E 34,892.13 10 1SLF-1-R 113.9 13.6 113.1 12.1 95 99 Pass <br />1N12 10/23/14 N 54,582.14 E 34,834.20 10 1SLF-1-R 113.9 13.6 113.2 12.0 95 99 Pass <br />1N13 10/23/14 N 54,520.45 E 34,910.68 10 1SLF-1-R 113.9 13.6 113.1 11.9 95 99 Pass <br />1N14 10/24/14 N 54,559.15 E 34,951.49 10 1SLF-1-R 113.9 13.6 113.1 11.8 95 99 Pass <br />1N15 10/24/14 N 54,560.69 E 35,014.05 10 1SLF-1-R 113.9 13.6 113.3 11.8 95 99 Pass <br />1N16 10/24/14 N 54,584.70 E 35,106.87 10 1SLF-1-R 113.9 13.6 113.3 12.2 95 99 Pass <br />1N17 10/24/14 N 54,654.62 E 35,030.87 10 1SLF-1-R 113.9 13.6 112.8 12.0 95 99 Pass <br />1N18 10/24/14 N 54,641.39 E 35,121.86 10 1SLF-1-R 113.9 13.6 113.9 11.6 95 100 Pass <br />1N19 10/24/14 N 54,708.64 E 35,087.78 10 1SLF-1-R 113.9 13.6 113.6 11.8 95 100 Pass <br />1N20 10/24/14 N 54,769.29 E 35,080.98 10 1SLF-1-R 113.9 13.6 113.8 11.8 95 100 Pass <br />1N21 10/27/14 N 54,718.28 E 35,218.19 10 1SLF-1-R 113.9 13.6 113.8 12.9 95 100 Pass <br />1N22 10/27/14 N 54,820.37 E 35,192.50 10 1SLF-1-R 113.9 13.6 113.6 13.1 95 100 Pass <br />1N23 10/27/14 N 54,797.29 E 35,115.12 10 1SLF-1-R 113.9 13.6 113.9 13.3 95 100 Pass <br />1N24 10/27/14 N 54,870.36 E 35,127.27 10 1SLF-1-R 113.9 13.6 113.8 13.1 95 100 Pass <br />1N25 10/28/14 N 54,935.91 E 35,202.57 10 1SLF-1-R 113.9 13.6 113.8 13.3 95 100 Pass <br />1N26 10/28/14 N 54,913.00 E 35,153.92 10 1SLF-1-R 113.9 13.6 113.9 13.5 95 100 Pass <br />1N27 10/29/14 N 55,072.00 E 35,192.23 10 1SLF-1-R 113.9 13.6 113.9 13.4 95 100 Pass <br />1N28 10/29/14 N 55,011.14 E 35,240.68 10 1SLF-1-R 113.9 13.6 113.9 13.3 95 100 Pass <br />COMPACTION <br />(%) <br />PASS/FAIL <br />FIELD <br />MOISTURE <br />CONTENT <br />(%) <br />TEST <br />NUMBER <br />DATE <br />TESTED <br />DEPTH <br />(inches)SAMPLE <br />NUMBER <br />MAX. DRY <br />DENSITY <br />(pcf) <br />LABORATORY <br />LOCATION OPTIMUM <br />MOISTURE <br />(%) <br />DRY <br />DENSITY <br />(pcf) <br />SPECIFIED <br />COMPACTION <br />(%) <br />Note: <br />Grey text reflects tests reported in approved or to be reported in <br />future Record of Construction Reports <br />Page 1 of 18