My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-01-14_REPORT - M1980244 (15)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2016-01-14_REPORT - M1980244 (15)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:14:32 PM
Creation date
1/15/2016 2:27:31 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
1/14/2016
Doc Name
Final Report Quality Assurance Monitoring & Test Results
From
Cripple Creek & Victor Gold Mining Company
To
DRMS
Email Name
TC1
ERR
AME
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cripple Creek & Victor Gold Mining Company <br />Squaw Gulch VLF Phase 1 <br />(9,550-foot Elevation Bench to Geomembrane Panel P1635) <br />Final Report <br />Quality Assurance Monitoring & Test Results <br />January 2016 <br />Project No.: 74201125N0 Page 30 <br />both materials meet both the required specifications (refer to Section 02200 in <br />Appendix E). <br />• A method specification was developed for use on slopes 2.5H:1V to achieve <br />compaction on the soil liner fill. The specification was proposed by Ames and tested <br />and accepted for use by Amec Foster Wheeler (see Appendix N for a copy of the <br />letter). Any areas where this method was used, observation and required testing <br />were performed and documented.
The URL can be used to link to this page
Your browser does not support the video tag.