Laserfiche WebLink
Cripple Creek & Victor Gold Mining Company <br />Squaw Gulch VLF Phase 1 <br />(9,550-foot Elevation Bench to Geomembrane Panel P1635) <br />Final Report <br />Quality Assurance Monitoring & Test Results <br />January 2016 <br />Project No.: 74201125N0 Page 31 <br />8.0 CONCLUSIONS <br />In accordance with our responsibilities as the Engineer of Record and as the Quality <br />Assurance Consultant for construction of the Phase 1 VLF (9,550-foot elevation bench <br />to Completed Areas Outlined on Figure 2) Project, and per the requirements of the <br />various applicable DRMS approvals, Amec Foster Wheeler attests that it observed and <br />performed the required CQA activities during construction. Based on daily <br />communications with Amec Foster Wheeler personnel, observations made during on- <br />site visits, and review of the laboratory and field test results, Amec Foster Wheeler <br />attests that the Project was constructed in compliance with the design plans and project <br />technical specifications as described in this document. <br />Sincerely, <br />Amec Foster Wheeler Environment & Infrastructure, Inc. <br /> <br /> <br /> <br /> <br />Robert Redd <br />Project Resident <br /> <br /> <br /> <br />Andrea L. Meduna, PE <br />Certifying Engineer <br /> <br /> <br /> <br />alm/ALM <br />