My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-01-14_REPORT - M1980244 (15)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2016-01-14_REPORT - M1980244 (15)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:14:32 PM
Creation date
1/15/2016 2:27:31 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
1/14/2016
Doc Name
Final Report Quality Assurance Monitoring & Test Results
From
Cripple Creek & Victor Gold Mining Company
To
DRMS
Email Name
TC1
ERR
AME
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cripple Creek & Victor Gold Mining Company <br />Squaw Gulch VLF Phase 1 <br />(9,550-foot Elevation Bench to Geomembrane Panel P1635) <br />Final Report <br />Quality Assurance Monitoring & Test Results <br />January 2016 <br />Project No.: 74201125N0 Page 4 <br />• Observe and document construction of secondary and tertiary underdrains, including <br />verification that Ames excavated the trenches to the minimum required dimensions <br />and grades, and placed the materials according to the project technical <br />specifications. Amec Foster Wheeler performed CQA laboratory testing of grain size, <br />Atterberg limits, and moisture content of underdrain fill (UF) and select structural fill <br />(SSF). <br />• Observe and document SLF placement including observation of depth verification <br />performed by Ames, grain size, moisture conditioning, and compaction of the <br />material. Amec Foster Wheeler performed in-place nuclear density and moisture <br />testing and CQA laboratory testing of grain size, moisture content, Atterberg limits, <br />Standard Proctor, and permeability. Amec Foster Wheeler also provided visual <br />monitoring of the SLF surface preparation and moisture conditioning for <br />geomembrane placement to include a rolled, compacted surface free of desiccation <br />cracks, abrupt grade changes, and sharp stones. Observation of excavation, backfill, <br />and compaction of anchor trenches occurred as part of SLF placement. <br />• Observe and document drain cover fill (DCF) placement above the 80-mil <br />double-sided microspike LLDPE geomembrane within the Project to include <br />verification of lift thickness, grade control, removal of deleterious materials, and that <br />care was exercised in DCF placement to avoid geomembrane damage. Amec Foster <br />Wheeler performed CQA laboratory testing of grain size and Atterberg limits. <br />• Observe and document installation of High Volume Solution Collection System <br />(HVSCS) piping which included placement of perforated Advanced Drainage System <br />(ADS) piping placement directly on the geomembrane followed by DCF material <br />placed over the pipe. <br />• Monitor and document the ambient air temperatures and the temperatures of the fill <br />materials, including SLF, in accordance with the project technical specifications. The <br />ambient air and fill temperatures monitored during fill activities are presented on <br />Tables 1 and 2, respectively. Note: The ambient air and fill temperatures are <br />recorded from September 2015 through December 2015; reporting of this data is <br />continued from the Squaw Gulch VLF Phase 1 (9,450’ to 9,550’ Bench) report by <br />Amec Foster Wheeler. <br /> CQA/CQC Monitoring of Geosynthetics Installation <br />Amec Foster Wheeler provided CQA monitoring of geosynthetics used for the Project. <br />CQA services consisted of performing geosynthetics inventory and checking quality <br />control certifications prior to geosynthetics deployment. CQA activities were performed <br />in accordance with the Geosynthetics CQA Plan (Section 1400.2 of the project technical <br />specifications, located in Appendix E). Geosynthetics CQA activities included: <br />• Inventory of geosynthetic materials delivered to the project site
The URL can be used to link to this page
Your browser does not support the video tag.