Laserfiche WebLink
Page 7 of 10 <br />SCRAPER TEAM WORK <br />Task description: Replace Topsoil on 13LT Utility Borehole Pad and Road; MR291 <br />Site: Foidel Creek Mine Permit Action: MR291 Permit/Job#: C1982056 <br />PROJECT IDENTIFICATION <br />Task #: 004 <br />Date: 12/22/2015 <br />User: JLE <br />State: Colorado <br />County: Routt <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COSTShift basis: 1 per day <br />Equipment Description <br />-Scraper: Cat 637G w/push-pull <br />-Dozer: NA <br />Cost Breakdown: <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance —Motor Grader: CAT 14M <br />-Water Truck: Water Tanker, 5,000 Gal. <br />Abbreviation: None <br />Filename: C056-004 <br />Scraner Work Team Sunnort Eaninment Maintenance Eauinment <br />Total work team cost/hour: $939.36 <br />MATERIAL OUANTITIES <br />Initial volume: 8,230 CCY Swell factor: 1.000 <br />Loose volume: 8,230 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization -machine: <br />100 <br />NA <br />NA <br />NA <br />50 <br />30 <br />Ownership cost/hour: <br />$110.90 <br />NA <br />NA <br />NA <br />$42.03 <br />$20.53 <br />Operating cost/hour: <br />$243.12 <br />NA <br />NA <br />NA <br />$34.94 <br />$14.33 <br />Ripper op. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />$0.00 <br />$0.00 <br />Operator cost/hour: <br />$33.56 <br />NA <br />NA <br />NA <br />$24.47 <br />$27.88 <br />Unit Subtotals: <br />$387.59 <br />NA <br />NA <br />NA <br />$101.43 <br />$62.75 <br />Number of Units: <br />2 <br />0 <br />0 <br />0 <br />1 <br />1 <br />Group Subtotals: <br />Work: <br />$775.18 <br />Support: <br />$0.00 <br />Maint: <br />$164.18 <br />Total work team cost/hour: $939.36 <br />MATERIAL OUANTITIES <br />Initial volume: 8,230 CCY Swell factor: 1.000 <br />Loose volume: 8,230 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />CIRCES Cost Estimating Software <br />Scraper Bowl (volume) Basis: <br />Material weight: <br />1,600 lbs/LCY <br />Struck Volume: <br />24.00 <br />LCY <br />Material description: <br />Top Soil <br />Heaped Volume: <br />34.00 <br />LCY <br />Rated Payload: <br />81,600 pounds <br />Average Volume: <br />29.00 <br />LCY <br />Payload Capacity: <br />51.00 LCY <br />Adjusted Capacity: <br />29.00 <br />LCY <br />CIRCES Cost Estimating Software <br />