Laserfiche WebLink
Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />Page 6 of 10 <br />0.830 <br />(1 SHIFT/DAY) <br />0.800 <br />(FND-RF) <br />1.000 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />1.095 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.4908 <br />Adjusted unit production: <br />Adjusted fleet production: <br />JOB TIME AND COST <br />418.46 LCY/hr <br />836.92 LCY/hr <br />Fleet size: 2 Dozer(s) <br />Unit cost: $0.518/LCY <br />Total job time: <br />Total job cost: <br />7.74 Hours <br />$3,355 <br />CIRCES Cost Estimating Software <br />