My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-12-21_REVISION - C1982056 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1982056
>
2015-12-21_REVISION - C1982056 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:13:38 PM
Creation date
1/4/2016 2:35:50 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Revision
Doc Date
12/21/2015
Doc Name
Adequacy Review No. 1
From
Twentymile Coal, LLC
To
DRMS
Type & Sequence
MR291
Email Name
JLE
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 8 of 10 <br />Cycle Time: <br />Scraper Loading Time: 1.00 Minutes <br />Maneuver and Spread Time: 0.60 Minutes <br />Job Condition Correction: <br />Site Altitude: 6745 feet <br />Scraper <br />Push Dozer <br />Source <br />Altitude Ad': 1.000 <br />NA <br />(CAT HB) <br />Job Efficiency: 0.830 <br />NA <br />(CAT HB) <br />Net Correction: 0.830 NA <br />Travel Time: <br />Road Condition: Hard, smooth, stabilized, surfaced, watered, maintained 2.0 <br />Haul Route: <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />Roll. Res (%) <br />Total Res (%) <br />Velocity (fpm) <br />Travel Time (min) <br />1 <br />1500.00 <br />0.00 <br />2.00 <br />2.00 <br />2939 <br />0.71 <br />Haul Time: 0.71 minutes <br />Return Route: <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />(%) <br />Roll. Res (%) <br />Total Res (%) <br />Velocity (fpm) <br />Travel Time <br />(min) <br />1 <br />1500.00 <br />0.00 <br />2.00 <br />2.00 <br />2960 <br />0.64 <br />Return Time: <br />Total Scraper team cycle time: <br />Adjusted for job conditions: <br />Selected Number of Scrapers: <br />Adjusted single scraper team (unit) hourly production: <br />Adjusted multiple scraper team (fleet) hourly production: <br />Unadjusted unit production/hour: 1,179.66 LCY/Hour <br />Optimal Number of Scrapers per push dozer: <br />JOB TIME AND COST <br />Fleet size: 1 <br />Unit cost: $0.959 <br />0.64 minutes <br />2.95 <br />979.12 <br />2 <br />979.12 <br />979.12 <br />minutes <br />LCY/Hour <br />Scraper(s) <br />LCY/Hour <br />LCY/Hour <br />Team(s) Total job time: 8.41 Hours <br />/LCY Total job cost: $7,896 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.