Laserfiche WebLink
CRIPPLE CREEK&VICTOR GOLD MINING Co. <br /> ANGLOGOLD ASHANTI (COLORADO) amec <br /> SQUAW GULCH (VLF)WEEKLY REPORT foster <br /> wheeler <br /> CQA ACTIVITIES: <br /> 1) Field Activities: <br /> The following activities were observed: Placement, compaction, density testing, depth verification and <br /> acceptance of Soil Liner Fill materials; geomembrane installation and acceptance; Drain Cover Fill <br /> placement; Spent Ore grading in PSSA; and pump monitoring at the LVSCS riser pipes. <br /> II) Laboratory Activities: <br /> Concrete testing (ADR2), atterberg limits, moisture, compaction, permeability and sieve analysis testing <br /> continued. <br /> The following samples were collected: Phase 1 —Soil Liner Fill; 1-SLF-55-R <br /> Phase 1 —Soil Liner Fill; 1-SLF-56-R <br /> Phase 1 —Soil Liner Fill; 1-SLF-57-R <br /> Phase 1 —Soil Liner Fill; 1-SLF-58-R <br /> Phase 1 —Soil Liner Fill; 1-SLF-59-R <br /> Cameron—Soil Liner Fill; SLF-203-C <br /> Cameron—Soil Liner Fill; SLF-204-C <br /> General Proiect Items <br /> Meetings and Discussions: <br /> The Weekly Contractor Meeting was held December 1, 2015 (Amec Foster Wheeler, CC&V, Ames). <br /> Amec Foster Wheeler and CC&V discussed the barren pipeline corridor immediately following the Weekly <br /> Contractor Meeting. <br /> Ames daily safety meetings <br /> Amec Foster Wheeler daily safety meetings <br /> Summary of Concerns: None. <br /> CC&V: Daily updates, reporting, and scheduling occurred between CC&V Projects, Amec Foster <br /> Wheeler: and Ames. <br /> Deliveries: None. <br /> CQA Monitor <br /> Submitted by: Date: December 02, 2015 <br /> Bobby Redd,El <br /> Project Resident <br /> Reviewed by: Date: <br /> CC&V Projects <br /> Reviewed By: Date: /2 A 3,i 5 <br /> Reviewed By: Date: <br />