My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-12-18_REPORT - M1980244 (2)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2015-12-18_REPORT - M1980244 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2020 4:22:33 PM
Creation date
12/23/2015 9:18:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
12/18/2015
Doc Name
QA Report
From
Newmont Mining
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CRIPPLE CREEK &VICTOR GOLD MINING Co. <br /> ANGLOGOLD ASHANTI (COLORADO) amec <br /> SQUAW GULCH (VLF) WEEKLY REPORT foster <br /> wheeler <br /> Underdrain System: <br /> Primary Underdrain: Complete. <br /> Secondary Underdrain: None. <br /> Tertiary Underdrain: None. <br /> Leak Detection: <br /> None. <br /> Geomembrane: <br /> Geomembrane installation within Phase 1 continued this week performing deployment, seaming, <br /> repair, and QA/QC activities. Approximately 124,603 square feet of 80mil LLDPE geomembrane <br /> was deployed. Soil Liner Fill was inspected and approved by AMEC, Ames and ECA <br /> representatives prior to geomembrane deployment. Approximately 6,079 linear feet of seam was <br /> fusion welded during deployment using one or two fusion welding machines for each day of <br /> deployment. Approximately 284 linear feet of extrusion welding was completed during this <br /> period. Destructive and non-destructive testing was completed in compliance with project <br /> technical specifications. <br /> Ames continuously excavated anchor trench ahead of geomembrane installation. After <br /> geomembrane testing was completed, the anchor trench above finished panels was backfilled <br /> and compacted per project specifications. <br /> See attached figure for approved geomembrane. <br /> Miscellaneous: <br /> None. <br /> II) Storm Water Management <br /> Best Management Practices (BMPs) continued to be performed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.