Laserfiche WebLink
AXA <br /> CRIPPLE CREEK &VICTOR GOLD MINING Co. <br /> ANGLOGOLD ASHANTI (COLORADO) amec <br /> SQUAW GULCH (VLF) WEEKLY REPORT foster <br /> wheeler <br /> ATTACHMENT A <br /> Amec Foster Wheeler-2015 CQA Field Staff Schedule MLE2 <br /> Name Sun Mon Tues Wed Thurs Fri Sat <br /> Nov 29 Nov 30 Dec 1 Dec 2 Dec 3 Dec 4 Dec 5 <br /> Bobby Redd PR PR PR PR PR <br /> Ben Melly ST GT GT GT GT <br /> Tyler Browning ST GT GT GT ST <br /> Shawn Wisely ST ST ST ST UG <br /> Madeline Tarasar ST ST ST ST ST <br /> David Woolley ST ST ST ST ST <br /> Rod Bernuth ST ST ST ST ST <br /> Steve Rice UG UG UG UG <br /> Philemon On an o GT <br /> Tony Dean ST <br /> Andrea Meduna PE <br /> LEGEND: <br /> UM = Unit Manager <br /> PM = Project Manager <br /> PCE = Project Certifying Engineer <br /> PE= Project Engineer <br /> PR = Project Resident <br /> LG = Lead Geosynthetics Engineer <br /> LS = Lead Soils Technician <br /> ST= Soil Technician <br /> LT= Laboratory Technician <br /> GL=Geosynthetics Lead <br /> GT= Geosynthetics Technician <br /> FLM= Field/Laboratory Manager <br /> UG = Underground Working Remediation <br /> SE= Senior Engineer <br /> GS = Geophysics Survey Geologist <br /> HY= Highway Design Engineer <br /> WI =Welding Inspector <br />